Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10823
Well Classification: GW Status: PR - 12/1/2010
Well Name/No:PA #333-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2010
FacilityID:278023LocationID:335103
County:GARFIELD #045Location:NWSE 32 6S95W 6
Field:PARACHUTE - #67350Elevation:5175 ft.
Basin:PICEANCE BASIN  
Planned Location:1977FSL  2168 FELLat/Long: 39.479259 / -108.020114Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.479280 / -108.020080Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2010             Measured TD: 6722 ft.    Vertical TD: 6688 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2010
Wellbore PermitDIRECTIONAL
Permit #:20051548 Expiration Date:6/1/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2293 FSL  1823 FEL
Bottom Hole Location:Sec: Twp: Footage: 2293 FSL  1823 FEL
Proposed Depth/Form:6750 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:12/17/2005
Spud Date:12/6/2005Spud Date Is:ACTUAL
Measured TD:6722 ft.Measured PB depth:6604 ft.
True Vertical TD:6688 ft.True Vertical PB depth:
Top PZ Location:Sec:32 Twp: 6S 95WFootage: 2294 FSL  1824 FEL
Bottom Hole Location:Sec:32 Twp: 6S 95WFootage: 2294 FSL  1824 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1499 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 0 ft., Bottom: 1499 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6722 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 913, Top: 2250 ft., Bottom: 6722 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1320 ft.NN
FORT UNION1574 ft.NN
MESAVERDE3381 ft.NN
CAMEO5907 ft.NN
ROLLINS6556 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/1/2010                 Interval Top: 4764 ft.    Interval Bottom: 6504 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/1/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/28/2006
Treatment Summary:3682 GALS 7.5% HCL; 719600# 30/50 SAND; 16975 BBLS SLICKWATER. NO TUBING STRING IN WELL; WELL PRODUCING UP CASING.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/3/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1068
CASING_PRESS 1265
Perforation Data:
Interval Top:4764 ft.# Of Holes:120
Interval Bottom:6504 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)14
Total Gas Produced (MCF)11844
GOR846000
GOR DeterminationMCFE
Average BOE per Day5.630
Average MCFE per Day32.677

 Federal Financial Assurance  i 

 Tribal Well  i No