Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10821
Well Classification: GW Status: PR - 2/26/2006
Well Name/No:PA #533-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/26/2006
FacilityID:278025LocationID:335103
County:GARFIELD #045Location:NWSE 32 6S95W 6
Field:PARACHUTE - #67350Elevation:5174 ft.
Basin:PICEANCE BASIN  
Planned Location:1947FSL  2162 FELLat/Long: 39.479169 / -108.020094Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.479199 / -108.020050Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/26/2006             Measured TD: 6648 ft.    Vertical TD: 6569 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/26/2006
Wellbore PermitDIRECTIONAL
Permit #:20051546 Expiration Date:6/1/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1498 FSL  1602 FEL
Bottom Hole Location:Sec: Twp: Footage: 1498 FSL  1602 FEL
Proposed Depth/Form:6738 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:1/13/2006
Spud Date:1/3/2006Spud Date Is:ACTUAL
Measured TD:6648 ft.Measured PB depth:6621 ft.
True Vertical TD:6569 ft.True Vertical PB depth:
Top PZ Location:Sec:32 Twp: 6S 95WFootage: 1493 FSL  1586 FEL
Bottom Hole Location:Sec:32 Twp: 6S 95WFootage: 1493 FSL  1586 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1533 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 1533 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6647 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 905, Top: 2060 ft., Bottom: 6647 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1321 ft.NN
FORT UNION1578 ft.NN
MESAVERDE3400 ft.NN
CAMEO5901 ft.NN
ROLLINS6566 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/26/2006                 Interval Top: 4720 ft.    Interval Bottom: 6519 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/1/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/28/2006
Treatment Summary:2890 GALS 7.5% HCL; 709700# 30/50 SAND; 16140 BBLS SLICKWATER. NO TUBING STRING IN WELL; WELL PRODUCING UP CASING.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/26/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1276
CASING_PRESS 1417
Perforation Data:
Interval Top:4720 ft.# Of Holes:104
Interval Bottom:6519 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)21281
GOR788185
GOR DeterminationMCFE
Average BOE per Day10.126
Average MCFE per Day58.754

 Federal Financial Assurance  i 

 Tribal Well  i No