Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10820
Well Classification: GW Status: PR - 5/7/2006
Well Name/No:FEDERAL #RWF 443-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/7/2006
FacilityID:277916LocationID:335176
County:GARFIELD #045Location:NESE 19 6S94W 6
Field:RULISON - #75400Elevation:5496 ft.
Basin:PICEANCE BASIN  
Planned Location:2104FSL  811 FELLat/Long: 39.509009 / -107.924051Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.509064 / -107.924042Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/7/2006             Measured TD: 8018 ft.    Vertical TD: 7970 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/7/2006
Wellbore PermitDIRECTIONAL
Permit #:20051515 Expiration Date:5/26/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1509 FSL  424 FEL
Bottom Hole Location:Sec: Twp: Footage: 1509 FSL  424 FEL
Proposed Depth/Form:8094 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:12/16/2005
Spud Date:11/26/2005Spud Date Is:ACTUAL
Measured TD:8018 ft.Measured PB depth:8000 ft.
True Vertical TD:7970 ft.True Vertical PB depth:
Top PZ Location:Sec:19 Twp: 6S 94WFootage: 1550 FSL  405 FEL
Bottom Hole Location:Sec:19 Twp: 6S 94WFootage: 1550 FSL  405 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1124 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8005 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 995, Top: 2680 ft., Bottom: 8005 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2112 ft.NN
MESAVERDE4474 ft.NN
CAMEO7116 ft.NN
ROLLINS7955 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/7/2006                  Interval Top: 5642 ft.    Interval Bottom: 7894 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/30/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/29/2006
Treatment Summary:4,438 GALS 7.5% HCL; 736,400# 20/40 SAND; 18,460 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7696 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/7/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 132200
CALC_MCF_GAS 1322
CASING_PRESS 1772
MCF_GAS 1322
TUBING_PRESS 1613
Perforation Data:
Interval Top:5642 ft.# Of Holes:141
Interval Bottom:7894 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)18256
GOR760666
GOR DeterminationMCFE
Average BOE per Day8.694
Average MCFE per Day50.428

 Federal Financial Assurance  i Y

 Tribal Well  i No