Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10804
Well Classification: GW Status: PR - 4/13/2006
Well Name/No:BOSLEY #SG 411-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/13/2006
FacilityID:277876LocationID:334721
County:GARFIELD #045Location:SWNW 23 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5162 ft.
Basin:PICEANCE BASIN  
Planned Location:2201FNL  384 FWLLat/Long: 39.424159 / -108.085595Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.424265 / -108.085620Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/13/2006             Measured TD: 5711 ft.    Vertical TD: 5502 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/13/2006
Wellbore PermitDIRECTIONAL
Permit #:20051483 Expiration Date:5/24/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1098 FNL  320 FWL
Bottom Hole Location:Sec: Twp: Footage: 1098 FNL  320 FWL
Proposed Depth/Form:5754 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-14 , Unit Acreage: 160, Drill Unit: NW4

Wellbore Completed
Completion Date:1/25/2006
Spud Date:1/18/2006Spud Date Is:ACTUAL
Measured TD:5711 ft.Measured PB depth:5641 ft.
True Vertical TD:5502 ft.True Vertical PB depth:
Top PZ Location:Sec:23 Twp: 7S 96WFootage: 1078 FNL  337 FWL
Bottom Hole Location:Sec:23 Twp: 7S 96WFootage: 1078 FNL  337 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1128 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1128 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5675 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 3635 ft., Bottom: 5675 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G861 ft.NN
FORT UNION1288 ft.NN
MESAVERDE2743 ft.NN
CAMEO5077 ft.NN
ROLLINS5584 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/13/2006                 Interval Top: 4111 ft.    Interval Bottom: 5525 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/10/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/6/2006
Treatment Summary:2586 GALS 7 1/2% HCL; 655,200# 30/50 SAND; 15093 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:4999 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/13/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 898
CASING_PRESS 912
TUBING_PRESS 766
Perforation Data:
Interval Top:4111 ft.# Of Holes:98
Interval Bottom:5525 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)11378
GOR875230
GOR DeterminationMCFE
Average BOE per Day5.402
Average MCFE per Day31.349

 Federal Financial Assurance  i Y

 Tribal Well  i No