Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10801
Well Classification: GW Status: PR - 10/29/2019
Well Name/No:FEDERAL #RWF 414-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date10/29/2019
FacilityID:277873LocationID:335744
County:GARFIELD #045Location:LOT 4 17 6S94W 6
Field:RULISON - #75400Elevation:6175 ft.
Basin:PICEANCE BASIN  
Planned Location:489FNL  13 FWLLat/Long: 39.531086 / -107.921253Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.531086 / -107.921252Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/24/2019
End Date: 10/2/2019
Reported: 10/30/2019
Days to report: 28
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/29/2019             Measured TD: 9149 ft.    Vertical TD: 8982 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/29/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/30/2020
Proposed Top PZ Location:Sec:8 Twp: 6S 94W Footage: 773 FSL  651 FWL
Bottom Hole Location:Sec:8 Twp: 6S 94W Footage: 773 FSL  651 FWL
Proposed Depth/Form:9195 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.4 , Citings Type: PLANNED
Cement:Sacks: 134, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 266, Top: 0 ft., Bottom: 1100 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9195 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1122, Top: 4578 ft., Bottom: 9195 ft.

Wellbore Completed
Completion Date:7/9/2019
Spud Date:7/4/2019Spud Date Is:ACTUAL
Measured TD:9149 ft.Measured PB depth:9107 ft.
True Vertical TD:8982 ft.True Vertical PB depth:8941 ft.
Top PZ Location:Sec:8 Twp: 6S 94WFootage: 733 FSL  622 FWL
Bottom Hole Location:Sec:8 Twp: 6S 94WFootage: 754 FSL  611 FWL
Log Types:CBL, NEU, (Triple Combo in API 045-24035)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 140, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1138 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1138 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9139 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1625, Top: 1380 ft., Bottom: 9149 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2780 ft.
WASATCH4713 ft.
MESAVERDE6365 ft.
OHIO CREEK6365 ft.
WILLIAMS FORK6457 ft.
CAMEO8146 ft.
ROLLINS9037 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/29/2019                Interval Top: 6366 ft.    Interval Bottom: 8904 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/29/2019Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/24/2019Treatment End Date:10/2/2019
Treatment Summary:113898 bbls of Slickwater; 3680 gals of biocide
Total fluid used in treatment (bbls):113986Max pressure during treatment (psi):8437
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.74
Recycled water used in treatment (bbls):88Total flowback volume recovered (bbls):28641
Fresh water used in treatment (bbls):113898Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8638 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/29/2019Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1047
CALC_MCF_GAS 1926
CASING_PRESS 2022
MCF_GAS 1926
TUBING_PRESS 1588
Perforation Data:
Interval Top:6366 ft.# Of Holes:315
Interval Bottom:8904 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)222
Total Gas Produced (MCF)89877
GOR404851
GOR DeterminationMCFE
Average BOE per Day43.085
Average MCFE per Day249.911

 Federal Financial Assurance  i Y

 Tribal Well  i No