|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/11/2019 Measured TD: 8996 ft. Vertical TD: 8906 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/11/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/30/2020 | | Proposed Top PZ Location: | Sec:17 Twp: 6S 94W | Footage: 1280 FNL 710 FWL | | Bottom Hole Location: | Sec:17 Twp: 6S 94W | Footage: 1280 FNL 710 FWL | | Proposed Depth/Form: | 9042 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.4 , Citings Type: PLANNED | | Cement: | Sacks: 134, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 266, Top: 0 ft., Bottom: 1100 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9042 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1115, Top: 4453 ft., Bottom: 9042 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/5/2019 | | Spud Date: | 6/1/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 8996 ft. | Measured PB depth: | 8955 ft. | | True Vertical TD: | 8906 ft. | True Vertical PB depth: | 8865 ft. | | Top PZ Location: | Sec:17 Twp: 6S 94W | Footage: 1247 FNL 720 FWL | | Bottom Hole Location: | Sec:17 Twp: 6S 94W | Footage: 1316 FNL 692 FWL | | Log Types: | CBL, NEU, (Triple Combo in API 045-24035) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.44 , Citings Type: ACTUAL | | Cement: | Sacks: 134, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1144 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 1144 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8986 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1620, Top: 1952 ft., Bottom: 8996 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 2843 ft. | | | | | WASATCH | 4590 ft. | | | | | MESAVERDE | 5308 ft. | | | | | OHIO CREEK | 5308 ft. | | | | | WILLIAMS FORK | 5381 ft. | | | | | CAMEO | 8012 ft. | | | | | ROLLINS | 8911 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 9/11/2019 Interval Top: 6259 ft. Interval Bottom: 8842 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/11/2019 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/8/2019 | Treatment End Date: | 7/19/2019 | | Treatment Summary: | 115866 bbls of Slickwater; 1128164 100/Mesh; 3310 gals of biocide | | Total fluid used in treatment (bbls): | 115945 | Max pressure during treatment (psi): | 9178 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 15 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.73 | | Recycled water used in treatment (bbls): | 115866 | Total flowback volume recovered (bbls): | 28354 | | Fresh water used in treatment (bbls): | 79 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1128164 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8579 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/11/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1110 | | CALC_MCF_GAS | 2940 | | CASING_PRESS | 2178 | | MCF_GAS | 2940 | | TUBING_PRESS | 2020 |
| | Perforation Data: | | Interval Top: | 6259 ft. | # Of Holes: | 315 | | Interval Bottom: | 8842 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 335 |
| Total Gas Produced (MCF) | 119178 |
| GOR | 355755 |
| GOR Determination | MCFE |
| Average BOE per Day | 57.231 |
| Average MCFE per Day | 331.942 |
| Federal Financial Assurance | i | Y |
|
|