Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10769
Well Classification: GW Status: PR - 1/1/2026
Well Name/No:N. PARACHUTE #WF07D I25 596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2026
FacilityID:277753LocationID:335590
County:GARFIELD #045Location:NESE 25 5S96W 6
Field:GRAND VALLEY - #31290Elevation:5726 ft.
Basin:PICEANCE BASIN  
Planned Location:2025FSL  318 FELLat/Long: 39.584467 / -108.109897Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.584476 / -108.109745Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2026             Measured TD: 9118 ft.    Vertical TD: 8833 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2026
Wellbore PermitDIRECTIONAL
Permit #:20051417 Expiration Date:5/17/2006
Proposed Top PZ Location:Sec:25 Twp: 5S 96W Footage: 2310 FNL  1650 FEL
Bottom Hole Location:Sec:25 Twp: 5S 96W Footage: 2310 FNL  1650 FEL
Proposed Depth/Form:10802 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/28/2005
Spud Date:9/5/2005Spud Date Is:ACTUAL
Measured TD:9118 ft.Measured PB depth:9062 ft.
True Vertical TD:8833 ft.True Vertical PB depth:8776 ft.
Top PZ Location:Sec:25 Twp: 5S 96WFootage: 2310 FNL  1650 FEL
Bottom Hole Location:Sec:25 Twp: 5S 96WFootage: 2310 FNL  1650 FEL
Log Types:MUD LOG, CBL, ARRAY INDUCTION, PHOTO DENSITY
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 90 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2489 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 0 ft., Bottom: 2489 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9105 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1750, Top: 3480 ft., Bottom: 9105 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5566 ft.NN
CAMEO8664 ft.NN
ROLLINS9030 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 1/1/2026                  Interval Top: 5888 ft.    Interval Bottom: 8341 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.500 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/28/2005
Treatment Summary:STAGES 01-06 TREATED WITH A TOTAL OF: 28,375 BBLS 1,007,464 LBS 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:7496 ft.
Tubing Packer Depth:5749 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/30/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1160
CASING_PRESS 0
MCF_GAS 1160
TUBING_PRESS 170
Perforation Data:
Interval Top:5888 ft.# Of Holes:129
Interval Bottom:8341 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)70
Total Gas Produced (MCF)13147
GOR187814
GOR DeterminationMCFE
Average BOE per Day6.415
Average MCFE per Day37.214

 Federal Financial Assurance  i 

 Tribal Well  i No