Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10759
Well Classification: GW Status: PR - 3/6/2006
Well Name/No:BOSLEY #SG 21-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC53525
Facility Status:PRStatus Date3/6/2006
FacilityID:277716LocationID:334601
County:GARFIELD #045Location:NENW 23 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5133 ft.
Basin:PICEANCE BASIN  
Planned Location:1130FNL  1497 FWLLat/Long: 39.427099 / -108.081625Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.427370 / -108.081700Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/6/2006             Measured TD: 5715 ft.    Vertical TD: 5501 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/6/2006
Wellbore PermitDIRECTIONAL
Permit #:20051425 Expiration Date:5/16/2006
Proposed Top PZ Location:Sec: Twp: Footage: 125 FNL  1870 FWL
Bottom Hole Location:Sec: Twp: Footage: 125 FNL  1870 FWL
Proposed Depth/Form:5816 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-14 , Unit Acreage: 160, Drill Unit: NW4

Wellbore Completed
Completion Date:1/6/2006
Spud Date:12/30/2005Spud Date Is:ACTUAL
Measured TD:5715 ft.Measured PB depth:5637 ft.
True Vertical TD:5501 ft.True Vertical PB depth:
Top PZ Location:Sec:23 Twp: 7S 96WFootage: 93 FNL  1904 FWL
Bottom Hole Location:Sec:23 Twp: 7S 96WFootage: 93 FNL  1904 FWL
Log Types:HIGH RESOLUTION INDUCTION,SPECTRAL DEN.,DUAL SPACED NEU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1131 ft., Weight: 0 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1130 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5704 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 640, Top: 3440 ft., Bottom: 5703 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G844 ft.NN
FORT UNION1268 ft.NN
MESAVERDE2785 ft.NN
CAMEO5155 ft.NN
ROLLINS5628 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/6/2006                  Interval Top: 4263 ft.    Interval Bottom: 5575 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/6/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:2/1/2006
Treatment Summary:2591 GALS 7 1/2% HCL; 630900# 30/50 SAND; 14586 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5080 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/6/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1746
CASING_PRESS 1391
TUBING_PRESS 1302
Perforation Data:
Interval Top:4263 ft.# Of Holes:94
Interval Bottom:5575 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)22
Total Gas Produced (MCF)16388
GOR744909
GOR DeterminationMCFE
Average BOE per Day7.794
Average MCFE per Day45.239

 Federal Financial Assurance  i 

 Tribal Well  i No