Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10730
Well Classification: GW Status: PR - 8/1/2020
Well Name/No:FEDERAL #31-11BB (PF31)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC #27823
Facility Status:PRStatus Date8/1/2020
FacilityID:277612LocationID:334085
County:GARFIELD #045Location:SENW 31 7S95W 6
Field:PARACHUTE - #67350Elevation:5833 ft.
Basin:PICEANCE BASIN  
Planned Location:2359FNL  1385 FWLLat/Long: 39.394830 / -108.043734Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.394860 / -108.043750Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2020             Measured TD: 6425 ft.    Vertical TD: 6003 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2020
Wellbore PermitDIRECTIONAL
Permit #:20051307 Expiration Date:5/11/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1500 FSL  1980 FWL
Bottom Hole Location:Sec: Twp: Footage: 1500 FSL  1980 FWL
Proposed Depth/Form:6700 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 139-46 , Unit Acreage: 640, Drill Unit: ALL
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-44 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:7/26/2005
Spud Date:7/3/2005Spud Date Is:ACTUAL
Measured TD:6425 ft.Measured PB depth:6320 ft.
True Vertical TD:6003 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1500 FSL  1980 FWL
Bottom Hole Location:Sec: Twp: Footage: 1500 FSL  1980 FWL
Log Types:PEX, CBL
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 4, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1508 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 1075, Top: 0 ft., Bottom: 1508 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6425 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1150, Top: 0 ft., Bottom: 6425 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH9 ft.3741 ft.NN
WILLIAMS FORK3742 ft.6263 ft.NN
ROLLINS6264 ft.6425 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 8/1/2020                  Interval Top: 4864 ft.    Interval Bottom: 6122 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:10/14/2005Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:7/8/2014Treatment End Date:7/9/2014
Treatment Summary:CBP @ 4750' W/ 2 SX CEMENT DRILLED OUT.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:8/21/2013Treatment End Date:8/21/2013
Treatment Summary:CBP SET @ 4750' AND TOPPED WITH 2 SX CEMENT
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/26/2005
Treatment Summary:STAGES 1 THROUGH 4 WERE TREATED WITH A TOTAL OF 11,035 BBLS SLICKWATER AND 513,000# 20-40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 348
BBLS_OIL 1
BTU_GAS 1170
CALC_BBLS_H2O 348
CALC_BBLS_OIL 1
CALC_GOR 335700
CALC_MCF_GAS 3357
CASING_PRESS 1050
MCF_GAS 3357
TUBING_PRESS 675
Perforation Data:
Interval Top:4864 ft.# Of Holes:74
Interval Bottom:6122 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)23122
GOR856370
GOR DeterminationMCFE
Average BOE per Day10.999
Average MCFE per Day63.786

 Federal Financial Assurance  i Y

 Tribal Well  i No