Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10720
Well Classification: GW Status: PR - 3/27/2006
Well Name/No:CLOUGH #RWF 433-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/27/2006
FacilityID:277526LocationID:335101
County:GARFIELD #045Location:NESE 21 6S94W 6
Field:RULISON - #75400Elevation:5316 ft.
Basin:PICEANCE BASIN  
Planned Location:1802FSL  827 FELLat/Long: 39.508319 / -107.886790Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.508451 / -107.886906Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/27/2006             Measured TD: 7658 ft.    Vertical TD: 7617 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/27/2006
Wellbore PermitDIRECTIONAL
Permit #:20051206 Expiration Date:5/8/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1615 FSL  1389 FEL
Bottom Hole Location:Sec: Twp: Footage: 1615 FSL  1389 FEL
Proposed Depth/Form:7662 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:12/2/2005
Spud Date:11/16/2005Spud Date Is:ACTUAL
Measured TD:7658 ft.Measured PB depth:7581 ft.
True Vertical TD:7617 ft.True Vertical PB depth:
Top PZ Location:Sec:21 Twp: 6S 94WFootage: 1624 FSL  1378 FEL
Bottom Hole Location:Sec:21 Twp: 6S 94WFootage: 1624 FSL  1378 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1113 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1113 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7635 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 975, Top: 3210 ft., Bottom: 7635 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1552 ft.NN
MESAVERDE4064 ft.NN
CAMEO6832 ft.NN
ROLLINS7658 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/27/2006                 Interval Top: 5404 ft.    Interval Bottom: 7484 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/23/2006Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/22/2006
Treatment Summary:2997 GALS 7 1/2% HCL; 602,100# 20/40 SAND; 14847 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7060 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/27/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 111600
CALC_MCF_GAS 1116
CASING_PRESS 1719
MCF_GAS 1116
TUBING_PRESS 1615
Perforation Data:
Interval Top:5404 ft.# Of Holes:112
Interval Bottom:7484 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)22
Total Gas Produced (MCF)14502
GOR659181
GOR DeterminationMCFE
Average BOE per Day6.915
Average MCFE per Day40.104

 Federal Financial Assurance  i 

 Tribal Well  i No