Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10699
Well Classification: GW Status: PR - 7/1/2024
Well Name/No:N. PARACHUTE #EF15D A28 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2024
FacilityID:277385LocationID:335804
County:GARFIELD #045Location:NENE 28 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6306 ft.
Basin:PICEANCE BASIN  
Planned Location:455FNL  948 FELLat/Long: 39.590817 / -108.053336Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.590771 / -108.053333Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2024             Measured TD: 10100 ft.    Vertical TD: 9981 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20051225 Expiration Date:4/25/2006
Proposed Top PZ Location:Sec:21 Twp: 5S 95W Footage: 330 FSL  1650 FEL
Bottom Hole Location:Sec:21 Twp: 5S 95W Footage: 330 FSL  1650 FEL
Proposed Depth/Form:10594 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit: UNSPAC

Wellbore Completed
Completion Date:10/11/2005
Spud Date:8/24/2005Spud Date Is:ACTUAL
Measured TD:10100 ft.Measured PB depth:8602 ft.
True Vertical TD:9981 ft.True Vertical PB depth:9483 ft.
Top PZ Location:Sec:21 Twp: 5S 95WFootage: 404 FSL  1657 FEL
Bottom Hole Location:Sec:21 Twp: 5S 95WFootage: 404 FSL  1657 FEL
Log Types:CBL,ARRAY INDUCTION,COMPENSATED DUAL NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 80 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2520 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 0 ft., Bottom: 2520 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10086 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 2250, Top: 550 ft., Bottom: 10086 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6294 ft.9870 ft.NN
ROLLINS9870 ft.10100 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 7/1/2024                  Interval Top: 6544 ft.    Interval Bottom: 8837 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:1/23/2006Choke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/19/2006
Treatment Summary:STAGES 1-9 TREATED WITH A TOTAL OF: 29,727 BBLS OF SLICKWATER, 966,707 LBS 20/40 SAND, 120 BBL 15% HCI.
Tubing Size:2.375 in.Tubing Setting Depth:6549 ft.
Tubing Packer Depth:6527 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/21/2006Test Method:
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 1156
CASING_PRESS 38
MCF_GAS 1156
TUBING_PRESS 749
Perforation Data:
Interval Top:6544 ft.# Of Holes:117
Interval Bottom:8837 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)4024
GOR211789
GOR DeterminationMCFE
Average BOE per Day1.951
Average MCFE per Day11.330

 Federal Financial Assurance  i 

 Tribal Well  i No