Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10697
Well Classification: GW Status: PR - 7/1/2024
Well Name/No:N. PARACHUTE #EF07D A28 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2024
FacilityID:277383LocationID:335804
County:GARFIELD #045Location:NENE 28 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6303 ft.
Basin:PICEANCE BASIN  
Planned Location:463FNL  948 FELLat/Long: 39.590797 / -108.053336Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.590748 / -108.053330Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2024             Measured TD: 10220 ft.    Vertical TD: 9863 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20051222 Expiration Date:4/25/2006
Proposed Top PZ Location:Sec:28 Twp: 5S 95W Footage: 2310 FNL  1650 FEL
Bottom Hole Location:Sec:28 Twp: 5S 95W Footage: 2310 FNL  1650 FEL
Proposed Depth/Form:10858 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit: UNSPAC

Wellbore Completed
Completion Date:11/8/2005
Spud Date:8/31/2005Spud Date Is:ACTUAL
Measured TD:10220 ft.Measured PB depth:10155 ft.
True Vertical TD:9863 ft.True Vertical PB depth:9798 ft.
Top PZ Location:Sec:28 Twp: 5S 95WFootage: 2338 FNL  1638 FEL
Bottom Hole Location:Sec:28 Twp: 5S 95WFootage: 2338 FNL  1638 FEL
Log Types:ARRY INDDUCTION,COMP.DUAL NEUTRON,MUD CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 10, Top: , Bottom: 80 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2447 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 850, Top: , Bottom: 2447 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10203 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1865, Top: 1450 ft., Bottom: 10207 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6532 ft.10038 ft.NN
ROLLINS10038 ft.10220 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 7/1/2024                  Interval Top: 6844 ft.    Interval Bottom: 9479 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:1/23/2006Choke Size:0.344 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/18/2006
Treatment Summary:STAGES 1-8 TREATED WITH A TOTAL OF: 33,274 BBLS OF SLICKWATER, 1,041,863 LBS 20/40 SAND, 108 BBLS 15% HCL.
Tubing Size:2.375 in.Tubing Setting Depth:8609 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/21/2006Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 950
CASING_PRESS 1085
MCF_GAS 950
TUBING_PRESS 562
Perforation Data:
Interval Top:6844 ft.# Of Holes:165
Interval Bottom:9479 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)5073
GOR181178
GOR DeterminationMCFE
Average BOE per Day2.473
Average MCFE per Day14.371

 Federal Financial Assurance  i 

 Tribal Well  i No