Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10689
Well Classification: GW Status: PR - 10/3/2006
Well Name/No:CHEVRON #TR 33-33-597
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/3/2006
FacilityID:277375LocationID:324301
County:GARFIELD #045Location:NWSE 33 5S97W 6
Field:TRAIL RIDGE - #83825Elevation:8291 ft.
Basin:PICEANCE BASIN  
Planned Location:2229FSL  1686 FELLat/Long: 39.568816 / -108.279612Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.569058 / -108.279531Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/3/2006             Measured TD: 8450 ft.    Vertical TD: 8439 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/3/2006
Wellbore PermitDIRECTIONAL
Permit #:20060827 Expiration Date:3/14/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2145 FSL  1980 FEL
Bottom Hole Location:Sec:33 Twp: 5S 97W Footage: 2145 FSL  1980 FEL
Proposed Depth/Form:8393 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-17 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/8/2006
Spud Date:5/26/2006Spud Date Is:ACTUAL
Measured TD:8450 ft.Measured PB depth:8400 ft.
True Vertical TD:8439 ft.True Vertical PB depth:
Top PZ Location:Sec:33 Twp: 5S 97WFootage: 2154 FSL  1979 FEL
Bottom Hole Location:Sec:33 Twp: 5S 97WFootage: 2154 FSL  1979 FEL
Log Types:CBL;RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2952 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1343, Top: 0 ft., Bottom: 2951 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8432 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 820, Top: 5158 ft., Bottom: 8432 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G4004 ft.NN
FORT UNION4190 ft.NN
MESAVERDE5561 ft.NN
CAMEO7897 ft.NN
ROLLINS8286 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/3/2006                 Interval Top: 6266 ft.    Interval Bottom: 8228 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/3/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/23/2006
Treatment Summary:5000 GALS 10% ACETIC ACID; 747,200# 20/40 SAND; 17,436 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8098 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/8/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1726
MCF_GAS 1530
TUBING_PRESS 1371
Perforation Data:
Interval Top:6266 ft.# Of Holes:146
Interval Bottom:8228 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)102
Total Gas Produced (MCF)39720
GOR389411
GOR DeterminationMCFE
Average BOE per Day19.049
Average MCFE per Day110.490

 Federal Financial Assurance  i 

 Tribal Well  i No