Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10670
Well Classification: OW Status: PR - 9/7/2005
Well Name/No:CHEVRON #GM 423-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/7/2005
FacilityID:277327LocationID:335420
County:GARFIELD #045Location:NESW 20 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5847 ft.
Basin:PICEANCE BASIN  
Planned Location:1874FSL  2042 FWLLat/Long: 39.507558 / -108.134707Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.507575 / -108.134627Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/7/2005             Measured TD: 7089 ft.    Vertical TD: 7087 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/7/2005
Wellbore PermitDIRECTIONAL
Permit #:20051009 Expiration Date:4/21/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1875 FSL  2010 FWL
Bottom Hole Location:Sec: Twp: Footage: 1875 FSL  2010 FWL
Proposed Depth/Form:7126 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: SW/4

Wellbore Completed
Completion Date:7/23/2005
Spud Date:6/3/2005Spud Date Is:ACTUAL
Measured TD:7089 ft.Measured PB depth:7060 ft.
True Vertical TD:7087 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1875 FSL  2010 FWL
Bottom Hole Location:Sec: Twp: Footage: 1875 FSL  2010 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1124 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 1124 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7082 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1030, Top: 3200 ft., Bottom: 7082 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2257 ft.NN
FORT UNION2590 ft.NN
MESAVERDE3942 ft.NN
CAMEO6503 ft.NN
ROLLINS6997 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 9/7/2005                  Interval Top: 5376 ft.    Interval Bottom: 6890 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/23/2005
Treatment Summary:4027 GALS 7 1/2% HCL, 528600# 30/50, 12607 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6224 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/7/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1453
CASING_PRESS 1017
MCF_GAS 1453
TUBING_PRESS 1092
Perforation Data:
Interval Top:5376 ft.# Of Holes:93
Interval Bottom:6890 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)18156
GOR756500
GOR DeterminationMCFE
Average BOE per Day8.642
Average MCFE per Day50.139

 Federal Financial Assurance  i 

 Tribal Well  i No