Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10660
Well Classification: GW Status: PR - 8/17/2005
Well Name/No:CHEVRON #TR 33-27-597
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/17/2005
FacilityID:277300LocationID:324297
County:GARFIELD #045Location:NWSE 27 5S97W 6
Field:TRAIL RIDGE - #83825Elevation:8384 ft.
Basin:PICEANCE BASIN  
Planned Location:2471FSL  2091 FELLat/Long: 39.584046 / -108.262482Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.584199 / -108.262362Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/17/2005             Measured TD: 8931 ft.    Vertical TD: 8931 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/17/2005
Wellbore Permit
Permit #:20051035 Expiration Date:4/20/2006
Proposed Depth/Form:8901 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/17/2005
Spud Date:6/30/2005Spud Date Is:ACTUAL
Measured TD:8931 ft.Measured PB depth:8716 ft.
True Vertical TD:8931 ft.True Vertical PB depth:
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2617 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1604, Top: 0 ft., Bottom: 2617 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8885 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 4860 ft., Bottom: 8885 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT UNION4486 ft.NN
MESAVERDE5903 ft.NN
CAMEO8301 ft.NN
ROLLINS8732 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/17/2005                 Interval Top: 6779 ft.    Interval Bottom: 8667 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.500 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/17/2005
Treatment Summary:COBRAMAX TREATMENT - 4650 GAL 7.5% HCL, FRAC IN 15 TOTAL STAGE WITH 15,824 BBLS SLICK WATER, 625,090 LBS 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:8448 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/19/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 375
CASING_PRESS 1565
TUBING_PRESS 1444
Perforation Data:
Interval Top:6779 ft.# Of Holes:124
Interval Bottom:8667 ft.Hole Size:0.75 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)8316
GOR489176
GOR DeterminationMCFE
Average BOE per Day3.976
Average MCFE per Day23.064

 Federal Financial Assurance  i 

 Tribal Well  i No