Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10656
Well Classification: GW Status: PR - 1/23/2006
Well Name/No:CHEVRON #GM 444-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/23/2006
FacilityID:277261LocationID:335419
County:GARFIELD #045Location:SESE 20 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5518 ft.
Basin:PICEANCE BASIN  
Planned Location:1044FSL  602 FELLat/Long: 39.505388 / -108.125457Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.505337 / -108.125259Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/23/2006             Measured TD: 6895 ft.    Vertical TD: 6880 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/23/2006
Wellbore PermitDIRECTIONAL
Permit #:20051014 Expiration Date:4/20/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1247 FSL  417 FEL
Bottom Hole Location:Sec: Twp: Footage: 1247 FSL  417 FEL
Proposed Depth/Form:6876 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:11/10/2005
Spud Date:10/30/2005Spud Date Is:ACTUAL
Measured TD:6895 ft.Measured PB depth:6793 ft.
True Vertical TD:6880 ft.True Vertical PB depth:
Top PZ Location:Sec:20 Twp: 6S 96WFootage: 1361 FSL  409 FEL
Bottom Hole Location:Sec:20 Twp: 6S 96WFootage: 1361 FSL  409 FEL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1132 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1132 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6864 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 828, Top: 4140 ft., Bottom: 6864 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2005 ft.NN
FORT UNION2312 ft.NN
MESAVERDE3747 ft.NN
CAMEO6216 ft.NN
ROLLINS6737 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/23/2006                 Interval Top: 4926 ft.    Interval Bottom: 6683 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/9/2005Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/3/2005
Treatment Summary:12/3/05 750 GALS 10% ACETIC ACID; 3504 GALS 7 1/2%HCL; 686,500# 30/50 SAND; 17031 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5959 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/23/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_MCF_GAS 1234
CASING_PRESS 1654
TUBING_PRESS 1526
Perforation Data:
Interval Top:4926 ft.# Of Holes:110
Interval Bottom:6683 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)14056
GOR520592
GOR DeterminationMCFE
Average BOE per Day6.714
Average MCFE per Day38.950

 Federal Financial Assurance  i 

 Tribal Well  i No