Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10641
Well Classification: GW Status: PR - 3/17/2005
Well Name/No:FEDERAL #GM 413-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 24603
Facility Status:PRStatus Date3/17/2005
FacilityID:277216LocationID:334788
County:GARFIELD #045Location:NWSW 3 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5799 ft.
Basin:PICEANCE BASIN  
Planned Location:2473FSL  1137 FWLLat/Long: 39.465449 / -108.100826Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.465540 / -108.100777Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/17/2005             Measured TD: 6600 ft.    Vertical TD: 6558 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/17/2005
Wellbore PermitDIRECTIONAL
Permit #:20050954 Expiration Date:4/18/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1907 FSL  1188 FWL
Bottom Hole Location:Sec: Twp: Footage: 1907 FSL  1188 FWL
Proposed Depth/Form:6681 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:8/11/2005
Spud Date:8/3/2005Spud Date Is:ACTUAL
Measured TD:6600 ft.Measured PB depth:6537 ft.
True Vertical TD:6558 ft.True Vertical PB depth:
Top PZ Location:Sec:3 Twp: 7S 96WFootage: 1908 FSL  1142 FWL
Bottom Hole Location:Sec:3 Twp: 7S 96WFootage: 1908 FSL  1142 FWL
Log Types:CBL; CHI PROCESSEC TRIPLE COMBO; GR-CCL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1122 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1122 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6600 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 813, Top: 3020 ft., Bottom: 6600 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1927 ft.NN
FORT UNION2244 ft.NN
MESAVERDE3611 ft.NN
CAMEO6055 ft.NN
ROLLINS6552 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/6/2005                 Interval Top: 4770 ft.    Interval Bottom: 6366 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/11/2005
Treatment Summary:9/9/05 2170 GALS 10% AETIC ACID; 1543 GALS 7 1/2% HCL; 756000# 30/50 SAND; 17713 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5930 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/6/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1432
MCF_GAS 1235
TUBING_PRESS 1344
Perforation Data:
Interval Top:4770 ft.# Of Holes:111
Interval Bottom:6366 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)11062
GOR526761
GOR DeterminationMCFE
Average BOE per Day5.288
Average MCFE per Day30.651

 Federal Financial Assurance  i Y

 Tribal Well  i No