Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10620
Well Classification: GW Status: PR - 8/28/2005
Well Name/No:FEDERAL #RWF 331-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/28/2005
FacilityID:277164LocationID:335369
County:GARFIELD #045Location:NENE 19 6S94W 6
Field:RULISON - #75400Elevation:5675 ft.
Basin:PICEANCE BASIN  
Planned Location:383FNL  900 FELLat/Long: 39.516549 / -107.924471Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.516608 / -107.924492Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/28/2005             Measured TD: 8121 ft.    Vertical TD: 7856 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/28/2005
Wellbore PermitDIRECTIONAL
Permit #:20050915 Expiration Date:4/14/2006
Proposed Top PZ Location:Sec:19 Twp: 6S 94W Footage: 1301 FNL  1730 FEL
Bottom Hole Location:Sec:19 Twp: 6S 94W Footage: 1301 FNL  1730 FEL
Proposed Depth/Form:8198 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:7/7/2005
Spud Date:6/6/2005Spud Date Is:ACTUAL
Measured TD:8121 ft.Measured PB depth:8089 ft.
True Vertical TD:7856 ft.True Vertical PB depth:
Top PZ Location:Sec:19 Twp: 6S 94WFootage: 1301 FNL  1730 FEL
Bottom Hole Location:Sec:19 Twp: 6S 94WFootage: 1301 FNL  1730 FEL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1113 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1113 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8109 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 925, Top: 3950 ft., Bottom: 8109 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2262 ft.NN
MESAVERDE4800 ft.NN
CAMEO7425 ft.NN
ROLLINS8231 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/28/2005                 Interval Top: 6016 ft.    Interval Bottom: 8008 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/7/2005
Treatment Summary:4500 GALS 7 1/2% HCL, 670200# 20/40, 16043 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7341 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/28/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1462
CASING_PRESS 1578
MCF_GAS 1462
TUBING_PRESS 1465
Perforation Data:
Interval Top:6016 ft.# Of Holes:118
Interval Bottom:8008 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)32
Total Gas Produced (MCF)14736
GOR460500
GOR DeterminationMCFE
Average BOE per Day7.050
Average MCFE per Day40.895

 Federal Financial Assurance  i Y

 Tribal Well  i No