Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10572
Well Classification: GW Status: PR - 5/16/2006
Well Name/No:FEDERAL #RWF 12-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date5/16/2006
FacilityID:276964LocationID:335432
County:GARFIELD #045Location:NWSW 19 6S94W 6
Field:RULISON - #75400Elevation:5816 ft.
Basin:PICEANCE BASIN  
Planned Location:2599FSL  147 FWLLat/Long: 39.510229 / -107.937721Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.510255 / -107.937689Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/16/2006             Measured TD: 8195 ft.    Vertical TD: 8189 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/16/2006
Wellbore PermitDIRECTIONAL
Permit #:20050747 Expiration Date:4/5/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2459 FNL  248 FWL
Bottom Hole Location:Sec: Twp: Footage: 2459 FNL  248 FWL
Proposed Depth/Form:8267 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:11/7/2005
Spud Date:10/23/2005Spud Date Is:ACTUAL
Measured TD:8195 ft.Measured PB depth:8114 ft.
True Vertical TD:8189 ft.True Vertical PB depth:
Top PZ Location:Sec:19 Twp: 6S 94WFootage: 2470 FNL  247 FWL
Bottom Hole Location:Sec:19 Twp: 6S 94WFootage: 2470 FNL  247 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1123 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1123 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8181 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 925, Top: 4200 ft., Bottom: 8181 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2532 ft.NN
MESAVERDE4906 ft.NN
CAMEO7476 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/16/2006                 Interval Top: 6091 ft.    Interval Bottom: 8107 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/7/2006Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:4/6/2006
Treatment Summary:3,138 GALS 7-1/2% HCL; 701,700# 20/40 SAND; 17,789 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7786 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/16/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1373
CASING_PRESS 2265
MCF_GAS 1373
TUBING_PRESS 2130
Perforation Data:
Interval Top:6091 ft.# Of Holes:148
Interval Bottom:8107 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)9598
GOR457047
GOR DeterminationMCFE
Average BOE per Day4.592
Average MCFE per Day26.662

 Federal Financial Assurance  i Y

 Tribal Well  i No