Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10515
Well Classification: GW Status: PR - 12/1/2005
Well Name/No:FEDERAL #332-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC49043
Facility Status:PRStatus Date12/1/2005
FacilityID:276731LocationID:334950
County:GARFIELD #045Location:SWNE 8 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6174 ft.
Basin:PICEANCE BASIN  
Planned Location:1697FNL  2396 FELLat/Long: 39.454339 / -108.130737Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.454376 / -108.130413Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2005             Measured TD: 6613 ft.    Vertical TD: 6598 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2005
Wellbore PermitDIRECTIONAL
Permit #:20050627 Expiration Date:3/23/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1933 FNL  2200 FEL
Bottom Hole Location:Sec: Twp: Footage: 1933 FNL  2200 FEL
Proposed Depth/Form:6630 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:9/7/2005
Spud Date:8/28/2005Spud Date Is:ACTUAL
Measured TD:6613 ft.Measured PB depth:6536 ft.
True Vertical TD:6598 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1933 FNL  2200 FEL
Bottom Hole Location:Sec: Twp: Footage: 1933 FNL  2200 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 40 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1119 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1119 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6576 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 758, Top: 4500 ft., Bottom: 6576 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT UNION2409 ft.NN
MESAVERDE3587 ft.NN
CAMEO6032 ft.NN
ROLLINS6458 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/1/2005                 Interval Top: 4812 ft.    Interval Bottom: 6424 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/7/2005
Treatment Summary:3250 GALS 10% ACETIC ACID; 567,500# 30/50 SAND; 12,990 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5754 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/1/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1115
CASING_PRESS 1340
TUBING_PRESS 1270
Perforation Data:
Interval Top:4812 ft.# Of Holes:85
Interval Bottom:6424 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)9109
GOR379541
GOR DeterminationMCFE
Average BOE per Day4.365
Average MCFE per Day25.345

 Federal Financial Assurance  i Y

 Tribal Well  i No