Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10490
Well Classification: GW Status: PR - 10/13/2005
Well Name/No:FEDERAL #PA 432-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/13/2005
FacilityID:276624LocationID:335450
County:GARFIELD #045Location:SENE 29 6S95W 6
Field:PARACHUTE - #67350Elevation:5870 ft.
Basin:PICEANCE BASIN  
Planned Location:2135FNL  838 FELLat/Long: 39.496629 / -108.015364Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.496637 / -108.015317Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/13/2005             Measured TD: 7908 ft.    Vertical TD: 7751 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/13/2005
Wellbore PermitDIRECTIONAL
Permit #:20050479 Expiration Date:3/16/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2463 FNL  2065 FEL
Bottom Hole Location:Sec: Twp: Footage: 2463 FNL  2065 FEL
Proposed Depth/Form:8032 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40, 44, Unit Acreage: , Drill Unit: UNSPAC

Wellbore Completed
Completion Date:8/17/2005
Spud Date:5/22/2005Spud Date Is:ACTUAL
Measured TD:7908 ft.Measured PB depth:7800 ft.
True Vertical TD:7751 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2463 FNL  2065 FEL
Bottom Hole Location:Sec: Twp: Footage: 2463 FNL  2065 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2548 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 705, Top: 0 ft., Bottom: 2548 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7896 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 4650 ft., Bottom: 7896 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2305 ft.NN
FORT UNION2677 ft.NN
MESAVERDE4518 ft.NN
CAMEO7340 ft.NN
ROLLINS7878 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/13/2005                Interval Top: 5833 ft.    Interval Bottom: 7609 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/17/2005
Treatment Summary:2500 GALS 10% ACETIC ACID, 2000 GALS 7.5% HCL, 697,600# 30/50 SAND, 17,259 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7214 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/13/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1078
CASING_PRESS 1197
TUBING_PRESS 1065
Perforation Data:
Interval Top:5833 ft.# Of Holes:136
Interval Bottom:7609 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)10810
GOR831538
GOR DeterminationMCFE
Average BOE per Day5.140
Average MCFE per Day29.829

 Federal Financial Assurance  i Y

 Tribal Well  i No