Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10456
Well Classification: GW Status: PR - 7/27/2005
Well Name/No:PA #544-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62737
Facility Status:PRStatus Date7/27/2005
FacilityID:276432LocationID:334820
County:GARFIELD #045Location:SESE 31 6S95W 6
Field:PARACHUTE - #67350Elevation:5252 ft.
Basin:PICEANCE BASIN  
Planned Location:655FSL  722 FELLat/Long: 39.475749 / -108.033684Lat/Long Source: Calculated From Footages
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/27/2005             Measured TD: 6695 ft.    Vertical TD: 6648 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/27/2005
Wellbore PermitDIRECTIONAL
Permit #:20050367 Expiration Date:3/6/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1274 FSL  863 FEL
Bottom Hole Location:Sec: Twp: Footage: 1274 FSL  863 FEL
Proposed Depth/Form:6815 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:5/14/2005
Spud Date:4/9/2005Spud Date Is:ACTUAL
Measured TD:6695 ft.Measured PB depth:6668 ft.
True Vertical TD:6648 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1274 FSL  863 FEL
Bottom Hole Location:Sec: Twp: Footage: 1274 FSL  863 FEL
Log Types:RESERVIOR MONITOR TOOL ELITE, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1003 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1003 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6694 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 865, Top: 2200 ft., Bottom: 6694 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1477 ft.NN
FORT UNION1762 ft.NN
MESAVERDE3520 ft.NN
CAMEO6081 ft.NN
ROLLINS6643 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/27/2005                 Interval Top: 5788 ft.    Interval Bottom: 6555 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/14/2005
Treatment Summary:1750 GALS 7.5% HCL; 374600# 30/50 SAND & 8894 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6202 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/7/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 957
CASING_PRESS 1014
MCF_GAS 957
TUBING_PRESS 921
Perforation Data:
Interval Top:5788 ft.# Of Holes:59
Interval Bottom:6555 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)18
Total Gas Produced (MCF)14134
GOR785222
GOR DeterminationMCFE
Average BOE per Day6.723
Average MCFE per Day39.021

 Federal Financial Assurance  i 

 Tribal Well  i No