Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10451
Well Classification: GW Status: PR - 11/4/2009
Well Name/No:GGU DALEY #11C-29-691
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/4/2009
FacilityID:276409LocationID:335339
County:GARFIELD #045Location:SWSW 20 6S91W 6
Field:MAMM CREEK - #52500Elevation:5961 ft.
Basin:PICEANCE BASIN  
Planned Location:412FSL  807 FWLLat/Long: 39.506961 / -107.584711Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.507095 / -107.584638Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/4/2009             Measured TD: 7465 ft.    Vertical TD: 7355 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/4/2009
Wellbore PermitDIRECTIONAL
Permit #:20050330 Expiration Date:3/3/2006
Proposed Top PZ Location:Sec:29 Twp: 6S 91W Footage: 361 FNL  664 FWL
Bottom Hole Location:Sec:29 Twp: 6S 91W Footage: 361 FNL  664 FWL
Proposed Depth/Form:7457 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:GIBSON GULCH UN Unit Number:C0C 052447X
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/9/2005
Spud Date:3/19/2005Spud Date Is:ACTUAL
Measured TD:7465 ft.Measured PB depth:7000 ft.
True Vertical TD:7355 ft.True Vertical PB depth:6890 ft.
Top PZ Location:Sec:29 Twp: 6S 91WFootage: 361 FNL  664 FWL
Bottom Hole Location:Sec:29 Twp: 6S 91WFootage: 361 FNL  664 FWL
Log Types:TRIPLE COMBO
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 250 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 750 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 0 ft., Bottom: 750 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7460 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 950, Top: 3300 ft., Bottom: 7460 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK3499 ft.NN
ROLLINS7075 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 11/4/2009                 Interval Top: 4754 ft.    Interval Bottom: 6646 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.750 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/9/2005
Treatment Summary:7,740 BBLS. OF SLICKWATER, 350,700 LBS. OF 30/50 SAND; 87,400 LBS. OF 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:4961 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/14/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 831
CASING_PRESS 160
MCF_GAS 831
Perforation Data:
Interval Top:4754 ft.# Of Holes:116
Interval Bottom:6646 ft.Hole Size:0.36 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)7
Total Gas Produced (MCF)2261
GOR323000
GOR DeterminationMCFE
Average BOE per Day1.085
Average MCFE per Day6.312

 Federal Financial Assurance  i 

 Tribal Well  i No