Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10407
Well Classification: GW Status: SI - 11/1/2025
Well Name/No:TBI #25-14BB (PC36)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2025
FacilityID:275951LocationID:334072
County:GARFIELD #045Location:NENW 36 7S96W 6
Field:PARACHUTE - #67350Elevation:5952 ft.
Basin:PICEANCE BASIN  
Planned Location:518FNL  2092 FWLLat/Long: 39.399910 / -108.060174Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.399970 / -108.060200Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 11/1/2025             Measured TD: 6100 ft.    Vertical TD: 6005 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 11/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20050139 Expiration Date:2/10/2006
Proposed Top PZ Location:Sec:25 Twp: 7S 96W Footage: 200 FSL  1980 FWL
Bottom Hole Location:Sec:25 Twp: 7S 96W Footage: 200 FSL  1980 FWL
Proposed Depth/Form:6129 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-44 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:1/27/2006
Spud Date:10/9/2005Spud Date Is:ACTUAL
Measured TD:6100 ft.Measured PB depth:6048 ft.
True Vertical TD:6005 ft.True Vertical PB depth:
Top PZ Location:Sec:25 Twp: 7S 96WFootage: 249 FSL  1985 FWL
Bottom Hole Location:Sec:25 Twp: 7S 96WFootage: 249 FSL  1985 FWL
Log Types:CBL, RST
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 6, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1518 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 1518 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6093 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 505, Top: 2924 ft., Bottom: 6096 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.3872 ft.NN
WILLIAMS FORK3873 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 11/1/2025                 Interval Top: 4536 ft.    Interval Bottom: 5839 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:4/10/2006Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/28/2006
Treatment Summary:STAGES 1 THROUGH 4 WERE TREATED WITH A TOTAL OF 16,107 BBLS OF SLICKWATER AND 601,903# 20-40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:5408 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/10/2006Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 3
BTU_GAS 1170
CALC_BBLS_H2O 5
CALC_BBLS_OIL 3
CALC_GOR 189333
CALC_MCF_GAS 568
CASING_PRESS 500
MCF_GAS 568
TUBING_PRESS 150
Perforation Data:
Interval Top:4536 ft.# Of Holes:84
Interval Bottom:5839 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)39
GOR
GOR DeterminationMCFE
Average BOE per Day0.017
Average MCFE per Day0.112

 Federal Financial Assurance  i Y

 Tribal Well  i No