Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10381
Well Classification: GW Status: PR - 8/29/2005
Well Name/No:WILLIAMS #GM 332-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/29/2005
FacilityID:275735LocationID:334903
County:GARFIELD #045Location:NENW 1 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5354 ft.
Basin:PICEANCE BASIN  
Planned Location:803FNL  2309 FWLLat/Long: 39.471449 / -108.058725Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.471127 / -108.058739Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/29/2005             Measured TD: 6652 ft.    Vertical TD: 6323 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/29/2005
Wellbore PermitDIRECTIONAL
Permit #:20050019 Expiration Date:1/25/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1225 FNL  2250 FWL
Bottom Hole Location:Sec: Twp: Footage: 1225 FNL  2250 FWL
Proposed Depth/Form:6726 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:6/2/2005
Spud Date:4/12/2005Spud Date Is:ACTUAL
Measured TD:6652 ft.Measured PB depth:6505 ft.
True Vertical TD:6323 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1225 FNL  2250 FWL
Bottom Hole Location:Sec: Twp: Footage: 1225 FNL  2250 FWL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1113 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1113 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6628 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 2540 ft., Bottom: 6628 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1696 ft.NN
FORT UNION1972 ft.NN
MESAVERDE3548 ft.NN
CAMEO6065 ft.NN
ROLLINS6576 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/29/2005                 Interval Top: 4692 ft.    Interval Bottom: 6365 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/2/2005
Treatment Summary:4750 GALS 7-1/2% HCL, 667800# 20/40, 15891 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:5986 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/16/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1322
CASING_PRESS 1174
MCF_GAS 1322
TUBING_PRESS 1050
Perforation Data:
Interval Top:4692 ft.# Of Holes:107
Interval Bottom:6365 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)4
Total Gas Produced (MCF)4360
GOR1090000
GOR DeterminationMCFE
Average BOE per Day2.067
Average MCFE per Day12.021

 Federal Financial Assurance  i 

 Tribal Well  i No