Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10373
Well Classification: GW Status: PR - 11/24/2005
Well Name/No:CLOUGH #RWF 442-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/24/2005
FacilityID:275677LocationID:335110
County:GARFIELD #045Location:SENE 22 6S94W 6
Field:RULISON - #75400Elevation:5234 ft.
Basin:PICEANCE BASIN  
Planned Location:2225FNL  712 FELLat/Long: 39.511779 / -107.867649Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.511811 / -107.867561Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/24/2005             Measured TD: 7598 ft.    Vertical TD: 7581 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/24/2005
Wellbore PermitDIRECTIONAL
Permit #:20043302 Expiration Date:1/20/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2139 FNL  312 FEL
Bottom Hole Location:Sec: Twp: Footage: 2139 FNL  312 FEL
Proposed Depth/Form:7622 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:9/8/2005
Spud Date:8/26/2005Spud Date Is:ACTUAL
Measured TD:7598 ft.Measured PB depth:7465 ft.
True Vertical TD:7581 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2139 FNL  312 FEL
Bottom Hole Location:Sec: Twp: Footage: 2139 FNL  312 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1124 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7585 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 965, Top: 2720 ft., Bottom: 7501 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND1469 ft.NN
MESAVERDE3988 ft.NN
CAMEO6877 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/24/2005                Interval Top: 5377 ft.    Interval Bottom: 7008 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/8/2005
Treatment Summary:10/17/05 900 GALS 7 1/2% HCL; 579,600# 20/40 SAND; 14,135 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6829 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/24/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 788
CASING_PRESS 802
MCF_GAS 788
TUBING_PRESS 636
Perforation Data:
Interval Top:5377 ft.# Of Holes:57
Interval Bottom:7008 ft.Hole Size:0.75 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)18
Total Gas Produced (MCF)8847
GOR491500
GOR DeterminationMCFE
Average BOE per Day4.227
Average MCFE per Day24.530

 Federal Financial Assurance  i 

 Tribal Well  i No