Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10368
Well Classification: GW Status: PR - 7/13/2006
Well Name/No:CLOUGH #RWF 541-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/13/2006
FacilityID:275671LocationID:335110
County:GARFIELD #045Location:SENE 22 6S94W 6
Field:RULISON - #75400Elevation:5234 ft.
Basin:PICEANCE BASIN  
Planned Location:2204FNL  691 FELLat/Long: 39.511839 / -107.867569Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.511868 / -107.867433Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/13/2006             Measured TD: 7746 ft.    Vertical TD: 7616 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/13/2006
Wellbore PermitDIRECTIONAL
Permit #:20054946 Expiration Date:1/24/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1210 FNL  249 FEL
Bottom Hole Location:Sec: Twp: Footage: 1210 FNL  249 FEL
Proposed Depth/Form:7766 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:4/23/2006
Spud Date:4/11/2006Spud Date Is:ACTUAL
Measured TD:7746 ft.Measured PB depth:7595 ft.
True Vertical TD:7616 ft.True Vertical PB depth:
Top PZ Location:Sec:22 Twp: 6S 94WFootage: 1208 FNL  255 FEL
Bottom Hole Location:Sec:22 Twp: 6S 94WFootage: 1208 FNL  255 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1716 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 455, Top: 0 ft., Bottom: 1716 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7721 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1060, Top: 2970 ft., Bottom: 1121 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1498 ft.NN
MESAVERDE4122 ft.NN
CAMEO7005 ft.NN
ROLLINS7845 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/13/2006                 Interval Top: 5488 ft.    Interval Bottom: 7582 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/26/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/25/2006
Treatment Summary:3506 GALS 7 1/2% HCL; 676400# 20/40 SAND; 18052 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7045 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/13/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1080
CASING_PRESS 1355
TUBING_PRESS 1136
Perforation Data:
Interval Top:5488 ft.# Of Holes:129
Interval Bottom:7582 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)30
Total Gas Produced (MCF)13306
GOR443533
GOR DeterminationMCFE
Average BOE per Day6.335
Average MCFE per Day36.729

 Federal Financial Assurance  i 

 Tribal Well  i No