|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2025 Measured TD: 6780 ft. Vertical TD: 6651 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20043171 | Expiration Date: | 1/13/2006 | | Proposed Top PZ Location: | Sec:31 Twp: 7S 95W | Footage: 1780 FSL 660 FWL | | Bottom Hole Location: | Sec:31 Twp: 7S 95W | Footage: 1780 FSL 660 FWL | | Proposed Depth/Form: | 6786 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-31/440, Unit Acreage: 640, Drill Unit: ALL |
| | |
| Wellbore Completed | | Completion Date: | 3/27/2005 | | Spud Date: | 3/18/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 6780 ft. | Measured PB depth: | 6640 ft. | | True Vertical TD: | 6651 ft. | True Vertical PB depth: | 6640 ft. | | Top PZ Location: | Sec:31 Twp: 7S 95W | Footage: 1780 FSL 660 FWL | | Bottom Hole Location: | Sec:31 Twp: 7S 95W | Footage: 1780 FSL 660 FWL | | Log Types: | TEMP/CBL,RST,PEX | | Log Types: | TEMP. & CBL, RST, PEX-AITH P-EXPRESS | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1532 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1070, Top: 0 ft., Bottom: 1532 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6780 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 2015, Top: 746 ft., Bottom: 6786 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4000 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 0 ft., Bottom: 0 ft., Determination Method: CALC | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4350 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | UNKNOWN | 0 ft. | 3400 ft. | N | N | | WASATCH | 0 ft. | 3400 ft. | N | N | | WILLIAMS FORK | 3401 ft. | 5929 ft. | N | N | | ROLLINS | 5930 ft. | 6280 ft. | N | N | | COZZETTE | 6281 ft. | 6504 ft. | N | N | | CORCORAN | 6505 ft. | 6780 ft. | N | N |
Formation CRCRN Formation Classification: GW Status: SI - 1/1/2008 Interval Top: 6534 ft. Interval Bottom: 6619 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 7/19/2005 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/2/2005 | | Treatment Summary: | STAGE 1 WAS TREATED WITH 899 BBLS OF SLICKWATER AND 28000 LBS OF 20/40 SAND. | | Formation Treatment | | Treatment Date: | 3/27/2005 | | Treatment Summary: | STAGE 1 WAS TREATED W/889 BBL OF SLICKWATER AND 28,000 LBS OF 20-40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | MCF_GAS | 58 |
| | Perforation Data: | | Interval Top: | 6534 ft. | # Of Holes: | 38 | | Interval Bottom: | 6619 ft. | Hole Size: | 0.32 in. |
|
Formation COZZ Formation Classification: GW Status: SI - 3/1/2011 Interval Top: 6286 ft. Interval Bottom: 6408 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 7/17/2005 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/8/2005 | | Treatment Summary: | STAGE 2 WAS TREATED WITH 2790 BBLS OF SLICKWATER AND 97000 LBS OF 20/40 SAND. | | Formation Treatment | | Treatment Date: | 3/27/2005 | | Treatment Summary: | STAGE 2 WAS TREATED W/2790 BBLS OF SLICKWATER AND 97,000 LBS OF 20-40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 6286 ft. | # Of Holes: | 108 | | Interval Bottom: | 6408 ft. | Hole Size: | 0.32 in. |
|
Formation RLNS Formation Classification: GW Status: SI - 6/1/2023 Interval Top: 5934 ft. Interval Bottom: 5982 ft.| Completed Information for Formation ROLLINS | | 1st Production Date: | 6/29/2005 | Choke Size: | | | Formation Name: | ROLLINS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/27/2005 | | Treatment Summary: | STAGE 3 WAS TREATED W/1929 BBLS OF SLICKWATER AND 72,00 LBS OF 20-40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | MCF_GAS | 116 |
| | Perforation Data: | | Interval Top: | 5934 ft. | # Of Holes: | 40 | | Interval Bottom: | 5982 ft. | Hole Size: | 0.32 in. |
|
Formation WMFK Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 4460 ft. Interval Bottom: 5873 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 6/29/2005 | Choke Size: | 18.000 in. | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/19/2005 | | Treatment Summary: | 9/19/05 STAGE 7 TREATED W/ TOTAL OF: 2984 BBLS OF SLICKWATER & 104000# OF 20/40 SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5899 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/17/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 17 | | BBLS_OIL | 4 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 17 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 165429 | | CALC_MCF_GAS | 405 | | CASING_PRESS | 1250 | | MCF_GAS | 5405 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 4460 ft. | # Of Holes: | 24 | | Interval Bottom: | 5873 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 9 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.006 |
| Average MCFE per Day | 0.025 |
| Federal Financial Assurance | i | Y |
|
|