Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10327
Well Classification: GW Status: PR - 10/26/2005
Well Name/No:FEDERAL #PA332-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/26/2005
FacilityID:275478LocationID:335246
County:GARFIELD #045Location:SWNE 32 6S95W 6
Field:PARACHUTE - #67350Elevation:5244 ft.
Basin:PICEANCE BASIN  
Planned Location:1733FNL  2095 FELLat/Long: 39.483519 / -108.019954Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.483514 / -108.019930Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/26/2005             Measured TD: 6761 ft.    Vertical TD: 6733 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/26/2005
Wellbore PermitDIRECTIONAL
Permit #:20043143 Expiration Date:1/3/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2152 FNL  2009 FEL
Bottom Hole Location:Sec: Twp: Footage: 5152 FNL  2009 FEL
Proposed Depth/Form:6852 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 160, Drill Unit: NE/4

Wellbore Completed
Completion Date:9/16/2005
Spud Date:8/17/2005Spud Date Is:ACTUAL
Measured TD:6761 ft.Measured PB depth:6692 ft.
True Vertical TD:6733 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2152 FNL  2009 FEL
Bottom Hole Location:Sec: Twp: Footage: 5152 FNL  2009 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE, MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1676 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 1676 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6755 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 890, Top: 2050 ft., Bottom: 6755 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1398 ft.NN
FORT UNION1734 ft.NN
MESAVERDE3469 ft.NN
CAMEO6036 ft.NN
ROLLINS6672 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/26/2005                Interval Top: 4732 ft.    Interval Bottom: 6620 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/16/2005
Treatment Summary:2500 GALS 10% ACETIC ACID; 1000 GALS 7 1/2% GALS HCL; 659400# 30/50 SAND; 15107 BBLS SLICKWATER (SUMMARY)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/26/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1047
Perforation Data:
Interval Top:4732 ft.# Of Holes:100
Interval Bottom:6620 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)25
Total Gas Produced (MCF)11461
GOR458440
GOR DeterminationMCFE
Average BOE per Day5.486
Average MCFE per Day31.812

 Federal Financial Assurance  i Y

 Tribal Well  i No