Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10326
Well Classification: GW Status: PR - 10/28/2005
Well Name/No:FEDERAL #PA432-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62740
Facility Status:PRStatus Date10/28/2005
FacilityID:275479LocationID:335246
County:GARFIELD #045Location:SWNE 32 6S95W 6
Field:PARACHUTE - #67350Elevation:5244 ft.
Basin:PICEANCE BASIN  
Planned Location:1721FNL  2105 FELLat/Long: 39.483549 / -108.019994Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.483545 / -108.019965Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/28/2005             Measured TD: 6805 ft.    Vertical TD: 6728 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/28/2005
Wellbore PermitDIRECTIONAL
Permit #:20043142 Expiration Date:1/3/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2463 FNL  1970 FEL
Bottom Hole Location:Sec: Twp: Footage: 2463 FNL  1970 FEL
Proposed Depth/Form:6900 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 160, Drill Unit: NE/4

Wellbore Completed
Completion Date:9/16/2005
Spud Date:8/3/2005Spud Date Is:ACTUAL
Measured TD:6805 ft.Measured PB depth:6745 ft.
True Vertical TD:6728 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2463 FNL  1970 FEL
Bottom Hole Location:Sec: Twp: Footage: 2463 FNL  1970 FEL
Log Types:CBL, HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1702 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 460, Top: 0 ft., Bottom: 1702 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6803 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 2290 ft., Bottom: 6803 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT UNION1757 ft.NN
MESAVERDE3511 ft.NN
CAMEO6071 ft.NN
ROLLINS6705 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/28/2005                Interval Top: 4871 ft.    Interval Bottom: 6646 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/16/2005
Treatment Summary:3000 GALS 10% ACETIC ACID, 1000 GALS 7.5% HCL, 793,400# 30/50 SAND, 18,584 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6310 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/28/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1285
CASING_PRESS 1579
TUBING_PRESS 1500
Perforation Data:
Interval Top:4871 ft.# Of Holes:123
Interval Bottom:6646 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)33
Total Gas Produced (MCF)16267
GOR492939
GOR DeterminationMCFE
Average BOE per Day7.777
Average MCFE per Day45.097

 Federal Financial Assurance  i Y

 Tribal Well  i No