|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 11/1/2025 Measured TD: 7383 ft. Vertical TD: 7275 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 11/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20042320 | Expiration Date: | 10/6/2005 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2076 FNL 2256 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 2097 FNL 2035 FWL | | Proposed Depth/Form: | 7900 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 3/22/2005 | | Spud Date: | 11/15/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7383 ft. | Measured PB depth: | 7313 ft. | | True Vertical TD: | 7275 ft. | True Vertical PB depth: | 7205 ft. | | Top PZ Location: | Sec: Twp: | Footage: 2076 FNL 2256 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 2097 FNL 2035 FWL | | Log Types: | DENSITY, NEUTRON, INDUCTION, GAMMA RAY, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 44 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 101 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2872 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 695, Top: 0 ft., Bottom: 2872 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7313 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 730, Top: 3950 ft., Bottom: 7313 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 2441 ft. | | N | N | | FORT UNION | 2971 ft. | | N | N | | WILLIAMS FORK | 4266 ft. | | N | N | | CAMEO | 6697 ft. | | N | N | | ROLLINS | 7183 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: SI - 11/1/2025 Interval Top: 5674 ft. Interval Bottom: 7086 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/22/2005 | | Treatment Summary: | 3/22/05-4/8/05 B J SERVICES PERFORMED AN HYDRO FRAC WITH 3168 BBL OF LIGHTING 22# GEL SYSTEM USING 343900# OF 20/40 FRAC SAND AND 7571# OF RESIN COATED MSE 14/30 MESH SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6952 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/30/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 1 | | BTU_GAS | 1049 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 190200 | | CALC_MCF_GAS | 951 | | CASING_PRESS | 2066 | | GRAVITY_OIL | 58 | | MCF_GAS | 951 | | TUBING_PRESS | 2050 |
| | Perforation Data: | | Interval Top: | 5674 ft. | # Of Holes: | 58 | | Interval Bottom: | 7086 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 7 |
| Total Gas Produced (MCF) | 5877 |
| GOR | 839571 |
| GOR Determination | MCFE |
| Average BOE per Day | 2.794 |
| Average MCFE per Day | 16.214 |
| Federal Financial Assurance | i | |
|
|