Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10303
Well Classification: GW Status: PR - 3/13/2005
Well Name/No:GM #324-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 49009
Facility Status:PRStatus Date3/13/2005
FacilityID:273944LocationID:335397
County:GARFIELD #045Location:SESW 27 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5598 ft.
Basin:PICEANCE BASIN  
Planned Location:1146FSL  2526 FWLLat/Long: 39.490898 / -108.095176Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.491087 / -108.095143Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/13/2005             Measured TD: 7018 ft.    Vertical TD: 6864 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/13/2005
Wellbore PermitDIRECTIONAL
Permit #:20042158 Expiration Date:9/30/2005
Proposed Top PZ Location:Sec: Twp: Footage: 153 FSL  2119 FWL
Bottom Hole Location:Sec: Twp: Footage: 153 FSL  2119 FWL
Proposed Depth/Form:7085 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:2/13/2005
Spud Date:12/6/2004Spud Date Is:ACTUAL
Measured TD:7018 ft.Measured PB depth:6970 ft.
True Vertical TD:6864 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 153 FSL  2119 FWL
Bottom Hole Location:Sec: Twp: Footage: 153 FSL  2119 FWL
Log Types:RESERVOIR MONITOR TOOL ELITE, C B L
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1128 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 1127 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6953 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 950, Top: 3250 ft., Bottom: 6952 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G2075 ft.NN
FORT UNION2392 ft.NN
CAMEO6524 ft.NN
ROLLINS6980 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/13/2005                 Interval Top: 5224 ft.    Interval Bottom: 6838 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/13/2005
Treatment Summary:4000 GALS 7 1/2% HCL,557300# 20/40, 12807 BBLS SLICKWATER, SUMMARY
Tubing Size:2.375 in.Tubing Setting Depth:6454 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/13/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1315
CASING_PRESS 1408
MCF_GAS 1315
TUBING_PRESS 1276
Perforation Data:
Interval Top:5224 ft.# Of Holes:89
Interval Bottom:6838 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)11400
GOR570000
GOR DeterminationMCFE
Average BOE per Day5.435
Average MCFE per Day31.557

 Federal Financial Assurance  i 

 Tribal Well  i No