Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10302
Well Classification: GW Status: PR - 8/1/2019
Well Name/No:GM #414-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 49008
Facility Status:PRStatus Date8/1/2019
FacilityID:273943LocationID:335388
County:GARFIELD #045Location:SWSW 23 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5915 ft.
Basin:PICEANCE BASIN  
Planned Location:319FSL  161 FWLLat/Long: 39.502168 / -108.084696Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.502148 / -108.084651Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2019             Measured TD: 7498 ft.    Vertical TD: 7420 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2019
Wellbore PermitDIRECTIONAL
Permit #:20042159 Expiration Date:9/30/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1098 FSL  760 FWL
Bottom Hole Location:Sec: Twp: Footage: 1098 FSL  760 FWL
Proposed Depth/Form:7621 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:3/8/2005
Spud Date:12/25/2004Spud Date Is:ACTUAL
Measured TD:7498 ft.Measured PB depth:7440 ft.
True Vertical TD:7420 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1098 FSL  760 FWL
Bottom Hole Location:Sec: Twp: Footage: 1098 FSL  760 FWL
Log Types:HIGH RESOLUTION IND.,SPECTRAL DEN.,DUAL SPACED NEU,CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 24 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1128 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 1128 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7484 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 931, Top: 3450 ft., Bottom: 7484 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G2460 ft.NN
FORT UNION2755 ft.NN
MESAVERDE4333 ft.NN
CAMEO6971 ft.NN
ROLLINS7482 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/1/2019                  Interval Top: 5738 ft.    Interval Bottom: 7271 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/8/2005
Treatment Summary:3250 GALS 7 1/2% HCL, 432100# 30/50, 10290 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6969 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/20/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1406
CASING_PRESS 1159
MCF_GAS 1406
TUBING_PRESS 1062
Perforation Data:
Interval Top:5738 ft.# Of Holes:74
Interval Bottom:7271 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)8636
GOR719666
GOR DeterminationMCFE
Average BOE per Day4.113
Average MCFE per Day23.862

 Federal Financial Assurance  i 

 Tribal Well  i No