Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10290
Well Classification: GW Status: PR - 4/11/2005
Well Name/No:PA #511-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/11/2005
FacilityID:273873LocationID:335391
County:GARFIELD #045Location:NWNW 35 6S95W 6
Field:PARACHUTE - #67350Elevation:5465 ft.
Basin:PICEANCE BASIN  
Planned Location:246FNL  666 FWLLat/Long: 39.487769 / -107.972992Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.487815 / -107.973070Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/11/2005             Measured TD: 7775 ft.    Vertical TD: 7692 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/11/2005
Wellbore PermitDIRECTIONAL
Permit #:20042175 Expiration Date:9/28/2005
Proposed Depth/Form:7790 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:2/16/2005
Spud Date:11/24/2004Spud Date Is:ACTUAL
Measured TD:7775 ft.Measured PB depth:7750 ft.
True Vertical TD:7692 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1090 FNL  323 FWL
Bottom Hole Location:Sec: Twp: Footage: 1090 FNL  323 FWL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2253 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 2252 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7758 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 875, Top: 3160 ft., Bottom: 7758 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G2047 ft.NN
FORT UNION2326 ft.NN
MESAVERDE4320 ft.NN
CAMEO6998 ft.NN
ROLLINS7748 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/11/2005                 Interval Top: 5800 ft.    Interval Bottom: 7514 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/16/2005
Treatment Summary:2500 GALS 7 1/2% HCL,439400# 20/40,10905 BBLS SLICKWATER, 7178-7514' 500 GALS 7.5% HCL; 92600# 20/40 SAND & 2276 BBLS SLICKWATER, 6790-7080 500 GALS 7.5% HCL; 84700# 20/40 SAND&2197 BBLS SLICKWATER,6523-6713' 500 GALS 7.5% HCL;69100# 20/40 SD&1724 BBLS SL
Tubing Size:2.375 in.Tubing Setting Depth:7015 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/11/2005Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 744
CASING_PRESS 903
TUBING_PRESS 765
Perforation Data:
Interval Top:5800 ft.# Of Holes:78
Interval Bottom:7514 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)8458
GOR768909
GOR DeterminationMCFE
Average BOE per Day4.029
Average MCFE per Day23.364

 Federal Financial Assurance  i 

 Tribal Well  i No