Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10288
Well Classification: OW Status: PR - 4/5/2005
Well Name/No:PA #311-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/5/2005
FacilityID:273875LocationID:335391
County:GARFIELD #045Location:NWNW 35 6S95W 6
Field:PARACHUTE - #67350Elevation:5465 ft.
Basin:PICEANCE BASIN  
Planned Location:254FNL  694 FWLLat/Long: 39.487749 / -107.972892Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.487793 / -107.972967Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/5/2005             Measured TD: 7785 ft.    Vertical TD: 7778 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/5/2005
Wellbore PermitDIRECTIONAL
Permit #:20042177 Expiration Date:9/28/2005
Proposed Top PZ Location:Sec: Twp: Footage: 498 FNL  719 FWL
Bottom Hole Location:Sec: Twp: Footage: 498 FNL  719 FWL
Proposed Depth/Form:7880 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:2/16/2005
Spud Date:12/24/2004Spud Date Is:ACTUAL
Measured TD:7785 ft.Measured PB depth:7664 ft.
True Vertical TD:7778 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 498 FNL  719 FWL
Bottom Hole Location:Sec: Twp: Footage: 498 FNL  719 FWL
Log Types:CBL/ RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2281 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 625, Top: 0 ft., Bottom: 2281 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7768 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 4010 ft., Bottom: 7768 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2044 ft.NN
FORT UNION2317 ft.NN
MESAVERDE4292 ft.NN
CAMEO7015 ft.NN
ROLLINS7744 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 4/5/2005                  Interval Top: 5780 ft.    Interval Bottom: 7524 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/16/2005
Treatment Summary:2500 GALS 7 1/2% HCL, 519000# 20/40, 12322 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7263 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/5/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1251
CASING_PRESS 1705
MCF_GAS 1251
TUBING_PRESS 1619
Perforation Data:
Interval Top:5780 ft.# Of Holes:78
Interval Bottom:7524 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)9442
GOR786833
GOR DeterminationMCFE
Average BOE per Day4.493
Average MCFE per Day26.051

 Federal Financial Assurance  i 

 Tribal Well  i No