Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10244
Well Classification: GW Status: PR - 3/30/2005
Well Name/No:WILLIAMS #GM 413-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/30/2005
FacilityID:273394LocationID:334925
County:GARFIELD #045Location:NWSW 1 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5238 ft.
Basin:PICEANCE BASIN  
Planned Location:1409FSL  1114 FWLLat/Long: 39.463459 / -108.063685Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.463529 / -108.063892Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/30/2005             Measured TD: 6565 ft.    Vertical TD: 6500 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/30/2005
Wellbore PermitDIRECTIONAL
Permit #:20041778 Expiration Date:8/17/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1801 FSL  730 FWL
Bottom Hole Location:Sec: Twp: Footage: 1801 FSL  730 FWL
Proposed Depth/Form:6520 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:4/10/2005
Spud Date:2/19/2005Spud Date Is:ACTUAL
Measured TD:6565 ft.Measured PB depth:6354 ft.
True Vertical TD:6500 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1801 FSL  730 FWL
Bottom Hole Location:Sec: Twp: Footage: 1801 FSL  730 FWL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1221 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 1122 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6370 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 775, Top: 2300 ft., Bottom: 6369 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1523 ft.NN
FORT UNION1813 ft.NN
MESAVERDE3348 ft.NN
CAMEO5856 ft.NN
ROLLINS6349 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/30/2005                 Interval Top: 4673 ft.    Interval Bottom: 6168 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/10/2005
Treatment Summary:3250 GALS 7 1/2% HCL, 590700# 30/50, 12003 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5877 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/2/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1287
CASING_PRESS 1073
MCF_GAS 1287
TUBING_PRESS 892
Perforation Data:
Interval Top:4673 ft.# Of Holes:83
Interval Bottom:6168 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)20408
GOR755851
GOR DeterminationMCFE
Average BOE per Day9.716
Average MCFE per Day56.351

 Federal Financial Assurance  i 

 Tribal Well  i No