Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10218
Well Classification: GW Status: PR - 11/21/2004
Well Name/No:FEDERAL #GM 331-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:070P088712
Facility Status:PRStatus Date11/21/2004
FacilityID:273092LocationID:334982
County:GARFIELD #045Location:NWNE 11 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5348 ft.
Basin:PICEANCE BASIN  
Planned Location:502FNL  1972 FELLat/Long: 39.457929 / -108.074985Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.458253 / -108.075241Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/21/2004             Measured TD: 6365 ft.    Vertical TD: 6349 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/21/2004
Wellbore PermitDIRECTIONAL
Permit #:20041571 Expiration Date:7/21/2005
Proposed Top PZ Location:Sec: Twp: Footage: 262 FNL  1872 FEL
Bottom Hole Location:Sec: Twp: Footage: 262 FNL  1872 FEL
Proposed Depth/Form:6337 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:10/12/2004
Spud Date:9/9/2004Spud Date Is:ACTUAL
Measured TD:6365 ft.Measured PB depth:6294 ft.
True Vertical TD:6349 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 262 FNL  1872 FEL
Bottom Hole Location:Sec: Twp: Footage: 262 FNL  1872 FEL
Log Types:RESERVOIR PERFORMANCE MONITOR, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1126 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1126 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6327 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 2800 ft., Bottom: 6327 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1517 ft.NN
FORT UNION1838 ft.NN
MESAVERDE3254 ft.NN
CAMEO5740 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/21/2004                Interval Top: 4452 ft.    Interval Bottom: 6150 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:10/12/2004
Treatment Summary:4750 GAL 7 1/2% HCL, 729578# 30/50 SAND, 16593 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5852 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2004Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1298
CASING_PRESS 1595
MCF_GAS 1298
TUBING_PRESS 1356
Perforation Data:
Interval Top:4452 ft.# Of Holes:114
Interval Bottom:6150 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)14650
GOR861764
GOR DeterminationMCFE
Average BOE per Day6.969
Average MCFE per Day40.415

 Federal Financial Assurance  i Y

 Tribal Well  i No