Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10214
Well Classification: GW Status: PR - 2/25/2005
Well Name/No:AMERICAN SODA #GM 534-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/25/2005
FacilityID:273054LocationID:334932
County:GARFIELD #045Location:SWSE 2 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5196 ft.
Basin:PICEANCE BASIN  
Planned Location:1117FSL  1539 FELLat/Long: 39.462429 / -108.073145Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.462698 / -108.073407Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/25/2005             Measured TD: 6236 ft.    Vertical TD: 6095 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/25/2005
Wellbore PermitDIRECTIONAL
Permit #:20041538 Expiration Date:7/18/2005
Proposed Top PZ Location:Sec: Twp: Footage: 139 FSL  1716 FEL
Bottom Hole Location:Sec: Twp: Footage: 139 FSL  1716 FEL
Proposed Depth/Form:6235 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: 40, Drill Unit: SWSE

Wellbore Completed
Completion Date:2/4/2005
Spud Date:12/17/2004Spud Date Is:ACTUAL
Measured TD:6236 ft.Measured PB depth:6150 ft.
True Vertical TD:6095 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 139 FSL  1716 FEL
Bottom Hole Location:Sec: Twp: Footage: 139 FSL  1716 FEL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1126 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 1126 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6198 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 2200 ft., Bottom: 6198 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1465 ft.NN
FORT UNION1754 ft.NN
MESAVERDE3215 ft.NN
CAMBRIAN5714 ft.NN
ROLLINS6184 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/25/2005                 Interval Top: 4404 ft.    Interval Bottom: 6121 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/4/2005
Treatment Summary:3000 GALS 7 1/2% HCL, 457570# 30/50, 10790 BBLS SLICK WATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:5771 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/25/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1606
CASING_PRESS 1611
MCF_GAS 1606
TUBING_PRESS 1529
Perforation Data:
Interval Top:4404 ft.# Of Holes:72
Interval Bottom:6121 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)14
Total Gas Produced (MCF)11925
GOR851785
GOR DeterminationMCFE
Average BOE per Day5.671
Average MCFE per Day32.902

 Federal Financial Assurance  i 

 Tribal Well  i No