Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10212
Well Classification: GW Status: PR - 1/26/2005
Well Name/No:FEDERAL #RWF 11-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/26/2005
FacilityID:273052LocationID:335448
County:GARFIELD #045Location:SESW 18 6S94W 6
Field:RULISON - #75400Elevation:5968 ft.
Basin:PICEANCE BASIN  
Planned Location:212FSL  1634 FWLLat/Long: 39.518169 / -107.932431Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.518218 / -107.932437Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/26/2005             Measured TD: 8705 ft.    Vertical TD: 8500 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/26/2005
Wellbore PermitDIRECTIONAL
Permit #:20041525 Expiration Date:7/18/2005
Proposed Top PZ Location:Sec:19 Twp: 6S 94W Footage: 187 FNL  255 FWL
Bottom Hole Location:Sec:19 Twp: 6S 94W Footage: 187 FNL  255 FWL
Proposed Depth/Form:8819 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:12/7/2004
Spud Date:9/16/2004Spud Date Is:ACTUAL
Measured TD:8705 ft.Measured PB depth:8600 ft.
True Vertical TD:8500 ft.True Vertical PB depth:
Top PZ Location:Sec:19 Twp: 6S 94WFootage: 187 FNL  255 FWL
Bottom Hole Location:Sec:19 Twp: 6S 94WFootage: 187 FNL  255 FWL
Log Types:HIGH RESOLUTION INDUCTION DUAL SPACED NEUTRON SPECTRAL DENSITY, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1101 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1101 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8688 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1020, Top: 3400 ft., Bottom: 8688 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2693 ft.NN
MESAVERDE5234 ft.NN
CAMEO7861 ft.NN
ROLLINS8815 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/26/2005                 Interval Top: 6454 ft.    Interval Bottom: 8524 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/7/2004
Treatment Summary:4750 GALS 7 1/2% HCL, 723640# 20/40, 17014 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7914 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/26/2005Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1957
CASING_PRESS 2580
MCF_GAS 1957
TUBING_PRESS 2471
Perforation Data:
Interval Top:6454 ft.# Of Holes:107
Interval Bottom:8524 ft.Hole Size:0.34 in.

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 1/26/2005                 Interval Top: 6454 ft.    Interval Bottom: 8524 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/7/2004
Treatment Summary:A) 8284-8524' 1000 GALS 7 1/2% HCL, 116300# 20/40, 2684 BBLS SLICK WATER. B) 7836-8117' 750 GALS 7 1/2% HCL, 105600# 20/40, 2658 BBLS SLICK WATER. C) 7446-7684' 750 GALS 7 1/2% HCL, 109700# 20/40, 2493 BBLS SLICK WATER. D) 7089-7292' 750 GALS (CONT)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WMFK.
Perforation Data:
Interval Top:6454 ft.# Of Holes:107
Interval Bottom:8524 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)7
Total Gas Produced (MCF)4032
GOR576000
GOR DeterminationMCFE
Average BOE per Day1.918
Average MCFE per Day11.117

 Federal Financial Assurance  i Y

 Tribal Well  i No