Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10207
Well Classification: GW Status: PR - 11/18/2005
Well Name/No:FEDERAL #GM 442-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/18/2005
FacilityID:273023LocationID:334884
County:GARFIELD #045Location:SENE 4 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5798 ft.
Basin:PICEANCE BASIN  
Planned Location:2018FNL  532 FELLat/Long: 39.467649 / -108.106446Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.467742 / -108.106426Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/18/2005             Measured TD: 6720 ft.    Vertical TD: 6693 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/18/2005
Wellbore PermitDIRECTIONAL
Permit #:20051276 Expiration Date:4/28/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1823 FNL  826 FEL
Bottom Hole Location:Sec: Twp: Footage: 1823 FNL  826 FEL
Proposed Depth/Form:6714 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:10/1/2005
Spud Date:8/27/2005Spud Date Is:ACTUAL
Measured TD:6720 ft.Measured PB depth:6670 ft.
True Vertical TD:6693 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1823 FNL  826 FEL
Bottom Hole Location:Sec: Twp: Footage: 1823 FNL  826 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1118 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1118 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6687 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 817, Top: 3450 ft., Bottom: 6686 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND1983 ft.NN
FORT UNION2235 ft.NN
MESAVERDE3542 ft.NN
CAMEO6101 ft.NN
ROLLINS6566 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/18/2005                Interval Top: 4862 ft.    Interval Bottom: 6197 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/1/2005
Treatment Summary:1750 GALS 10% ACETIC ACID 1532 GALS 7.5% HCL, 606,100# 30/50 SAND, 13,647 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5754 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/18/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1074
CASING_PRESS 770
TUBING_PRESS 568
Perforation Data:
Interval Top:4862 ft.# Of Holes:92
Interval Bottom:6197 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)10855
GOR402037
GOR DeterminationMCFE
Average BOE per Day5.200
Average MCFE per Day30.172

 Federal Financial Assurance  i Y

 Tribal Well  i No