Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10187
Well Classification: GW Status: PR - 2/11/2005
Well Name/No:FEDERAL #PA 443-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62162
Facility Status:PRStatus Date2/11/2005
FacilityID:272892LocationID:335389
County:GARFIELD #045Location:NESE 29 6S95W 6
Field:PARACHUTE - #67350Elevation:5736 ft.
Basin:PICEANCE BASIN  
Planned Location:1648FSL  537 FELLat/Long: 39.492799 / -108.014414Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.492765 / -108.014379Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/11/2005             Measured TD: 7653 ft.    Vertical TD: 7642 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/11/2005
Wellbore PermitDIRECTIONAL
Permit #:20041445 Expiration Date:7/6/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1386 FSL  490 FEL
Bottom Hole Location:Sec: Twp: Footage: 1386 FSL  490 FEL
Proposed Depth/Form:7728 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/8/2004
Spud Date:9/21/2004Spud Date Is:ACTUAL
Measured TD:7653 ft.Measured PB depth:7550 ft.
True Vertical TD:7642 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1386 FSL  490 FEL
Bottom Hole Location:Sec: Twp: Footage: 1386 FSL  490 FEL
Log Types:RESERVOIR PERFORMANCE MONITOR, CBL, MUD LOG, BOND ATTENUATION LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2273 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 786, Top: 0 ft., Bottom: 2272 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7633 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 875, Top: 3470 ft., Bottom: 7633 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2063 ft.NN
FORT UNION2409 ft.NN
MESAVERDE4202 ft.NN
CAMEO6951 ft.NN
ROLLINS7554 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/11/2005                 Interval Top: 5503 ft.    Interval Bottom: 7445 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/8/2004
Treatment Summary:4000 GALS 7 1/2% HCL, 614700# 30/50, 14294 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7065 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/11/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1069
CASING_PRESS 1411
MCF_GAS 1069
TUBING_PRESS 1293
Perforation Data:
Interval Top:5503 ft.# Of Holes:99
Interval Bottom:7445 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)18
Total Gas Produced (MCF)10904
GOR605777
GOR DeterminationMCFE
Average BOE per Day5.202
Average MCFE per Day30.179

 Federal Financial Assurance  i Y

 Tribal Well  i No