Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10182
Well Classification: GW Status: PR - 10/2/2005
Well Name/No:FEDERAL #GM 333-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 24603
Facility Status:PRStatus Date10/2/2005
FacilityID:272865LocationID:334795
County:GARFIELD #045Location:NWSE 4 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5913 ft.
Basin:PICEANCE BASIN  
Planned Location:2226FSL  1718 FELLat/Long: 39.464719 / -108.111016Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.464821 / -108.111041Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/2/2005             Measured TD: 6673 ft.    Vertical TD: 6622 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/2/2005
Wellbore PermitDIRECTIONAL
Permit #:20051139 Expiration Date:4/28/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2445 FSL  1315 FEL
Bottom Hole Location:Sec: Twp: Footage: 2445 FSL  1315 FEL
Proposed Depth/Form:6747 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:8/30/2005
Spud Date:7/21/2005Spud Date Is:ACTUAL
Measured TD:6673 ft.Measured PB depth:6601 ft.
True Vertical TD:6622 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2445 FSL  1315 FEL
Bottom Hole Location:Sec: Twp: Footage: 2445 FSL  1315 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1119 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1119 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6657 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 765, Top: 3300 ft., Bottom: 6657 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2052 ft.NN
FORT UNION2316 ft.NN
MESAVERDE3627 ft.NN
CAMEO6148 ft.NN
ROLLINS6604 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/2/2005                 Interval Top: 4822 ft.    Interval Bottom: 6529 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/30/2005
Treatment Summary:1750 GAL 10% ACETIC, 2000 7 1/2% HCL, 673900# 30/50, 16102 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5769 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/2/2005Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1261
CASING_PRESS 1751
TUBING_PRESS 1740
Perforation Data:
Interval Top:4822 ft.# Of Holes:105
Interval Bottom:6529 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)10880
GOR906666
GOR DeterminationMCFE
Average BOE per Day5.173
Average MCFE per Day30.006

 Federal Financial Assurance  i Y

 Tribal Well  i No