Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10182
Well Classification: GW Status: PR - 10/2/2005
Well Name/No:FEDERAL #GM 333-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 24603
Facility Status:PRStatus Date10/2/2005
FacilityID:272865LocationID:334795
County:GARFIELD #045Location:NWSE 4 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5913 ft.
Basin:PICEANCE BASIN  
Planned Location:2226FSL  1718 FELLat/Long: 39.464719 / -108.111016Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.464821 / -108.111041Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/2/2005             Measured TD: 6673 ft.    Vertical TD: 6622 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/2/2005
Wellbore PermitDIRECTIONAL
Permit #:20051139 Expiration Date:4/28/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2445 FSL  1315 FEL
Bottom Hole Location:Sec: Twp: Footage: 2445 FSL  1315 FEL
Proposed Depth/Form:6747 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:8/30/2005
Spud Date:7/21/2005Spud Date Is:ACTUAL
Measured TD:6673 ft.Measured PB depth:6601 ft.
True Vertical TD:6622 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2445 FSL  1315 FEL
Bottom Hole Location:Sec: Twp: Footage: 2445 FSL  1315 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1119 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1119 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6657 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 765, Top: 3300 ft., Bottom: 6657 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2052 ft.NN
FORT UNION2316 ft.NN
MESAVERDE3627 ft.NN
CAMEO6148 ft.NN
ROLLINS6604 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/2/2005                 Interval Top: 4822 ft.    Interval Bottom: 6529 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/30/2005
Treatment Summary:1750 GAL 10% ACETIC, 2000 7 1/2% HCL, 673900# 30/50, 16102 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5769 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/2/2005Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1261
CASING_PRESS 1751
TUBING_PRESS 1740
Perforation Data:
Interval Top:4822 ft.# Of Holes:105
Interval Bottom:6529 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)11045
GOR920416
GOR DeterminationMCFE
Average BOE per Day5.249
Average MCFE per Day30.458

 Federal Financial Assurance  i Y

 Tribal Well  i No