Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10176
Well Classification: GW Status: PR - 1/1/2012
Well Name/No:FEDERAL #GM 532-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date1/1/2012
FacilityID:272863LocationID:334795
County:GARFIELD #045Location:NWSE 4 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5912 ft.
Basin:PICEANCE BASIN  
Planned Location:2236FSL  1731 FELLat/Long: 39.464739 / -108.111056Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.464848 / -108.111080Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2012             Measured TD: 6679 ft.    Vertical TD: 6613 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2012
Wellbore PermitDIRECTIONAL
Permit #:20051274 Expiration Date:4/28/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2434 FNL  1798 FEL
Bottom Hole Location:Sec: Twp: Footage: 2434 FNL  1798 FEL
Proposed Depth/Form:6776 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:8/30/2005
Spud Date:7/31/2005Spud Date Is:ACTUAL
Measured TD:6679 ft.Measured PB depth:6641 ft.
True Vertical TD:6613 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2434 FNL  1798 FEL
Bottom Hole Location:Sec: Twp: Footage: 2434 FNL  1798 FEL
Log Types:CBL,RESERVOIR MONITOR TOOL ELITE, MUD LOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1112 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 0 ft., Bottom: 1112 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6657 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 790, Top: 3490 ft., Bottom: 6657 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2132 ft.NN
FORT UNION2360 ft.NN
MESAVERDE3646 ft.NN
CAMEO6177 ft.NN
ROLLINS6639 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/1/2012                  Interval Top: 4830 ft.    Interval Bottom: 6206 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/30/2005
Treatment Summary:1000 GALS 10% ACETIC, 2000 GALS 7 1/2% ACETIC, 522300/3 30/50, 12473 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5619 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/7/2005Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1345
CASING_PRESS 1227
TUBING_PRESS 1076
Perforation Data:
Interval Top:4830 ft.# Of Holes:79
Interval Bottom:6206 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)1392
GOR
GOR DeterminationMCFE
Average BOE per Day0.655
Average MCFE per Day3.814

 Federal Financial Assurance  i Y

 Tribal Well  i No