Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10164
Well Classification: GW Status: PR - 9/17/2005
Well Name/No:FEDERAL #PA 531-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/17/2005
FacilityID:272830LocationID:335452
County:GARFIELD #045Location:NWNE 32 6S95W 6
Field:PARACHUTE - #67350Elevation:5434 ft.
Basin:PICEANCE BASIN  
Planned Location:553FNL  1518 FELLat/Long: 39.486759 / -108.017984Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.486740 / -108.017973Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/17/2005             Measured TD: 7208 ft.    Vertical TD: 7135 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/17/2005
Wellbore PermitDIRECTIONAL
Permit #:20051282 Expiration Date:4/28/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1195 FNL  1969 FEL
Bottom Hole Location:Sec: Twp: Footage: 1195 FNL  1969 FEL
Proposed Depth/Form:7244 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:7/16/2005
Spud Date:7/5/2005Spud Date Is:ACTUAL
Measured TD:7208 ft.Measured PB depth:7070 ft.
True Vertical TD:7135 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1195 FNL  1969 FEL
Bottom Hole Location:Sec: Twp: Footage: 1195 FNL  1969 FEL
Log Types:CBL; TRIPLE COMBO; MUD LOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1866 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 0 ft., Bottom: 1866 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7204 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 977, Top: 3500 ft., Bottom: 7204 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1641 ft.NN
FORT UNION2002 ft.NN
MESAVERDE3758 ft.NN
CAMEO6371 ft.NN
ROLLINS7129 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/17/2005                 Interval Top: 5112 ft.    Interval Bottom: 7043 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/16/2005
Treatment Summary:3450 GALS 7 1/2% HCL; 736500# 30/50 SAND; 19536 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6700 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/17/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1259
CASING_PRESS 1456
MCF_GAS 1259
TUBING_PRESS 1298
Perforation Data:
Interval Top:5112 ft.# Of Holes:72
Interval Bottom:7043 ft.Hole Size:0.75 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)15
Total Gas Produced (MCF)12083
GOR805533
GOR DeterminationMCFE
Average BOE per Day5.737
Average MCFE per Day33.301

 Federal Financial Assurance  i Y

 Tribal Well  i No