Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10156
Well Classification: GW Status: PR - 1/2/2006
Well Name/No:WILLIAMS #RWF 41-30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/2/2006
FacilityID:272790LocationID:335141
County:GARFIELD #045Location:NWNW 29 6S94W 6
Field:RULISON - #75400Elevation:5263 ft.
Basin:PICEANCE BASIN  
Planned Location:821FNL  882 FWLLat/Long: 39.501029 / -107.917911Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.501114 / -107.918082Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/2/2006             Measured TD: 7675 ft.    Vertical TD: 7447 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/2/2006
Wellbore PermitDIRECTIONAL
Permit #:20051324 Expiration Date:4/28/2006
Proposed Top PZ Location:Sec:30 Twp: 6S 94W Footage: 825 FNL  450 FEL
Bottom Hole Location:Sec:30 Twp: 6S 94W Footage: 825 FNL  450 FEL
Proposed Depth/Form:7675 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:11/1/2005
Spud Date:10/8/2005Spud Date Is:ACTUAL
Measured TD:7675 ft.Measured PB depth:7542 ft.
True Vertical TD:7447 ft.True Vertical PB depth:
Top PZ Location:Sec:30 Twp: 6S 94WFootage: 841 FNL  346 FEL
Bottom Hole Location:Sec:30 Twp: 6S 94WFootage: 841 FNL  346 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; GR, CCL; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1109 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1109 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7648 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1070, Top: 3500 ft., Bottom: 7648 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1805 ft.NN
MESAVERDE4319 ft.NN
CAMEO7028 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/2/2006                  Interval Top: 4983 ft.    Interval Bottom: 7368 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/1/2005
Treatment Summary:12/6/05 1,107,500# 20/40 SAND; 19661 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:4870 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/2/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1802
CASING_PRESS 1652
TUBING_PRESS 1552
Perforation Data:
Interval Top:4983 ft.# Of Holes:348
Interval Bottom:7368 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)42
Total Gas Produced (MCF)14690
GOR349761
GOR DeterminationMCFE
Average BOE per Day7.059
Average MCFE per Day40.942

 Federal Financial Assurance  i Y

 Tribal Well  i No