Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10153
Well Classification: GW Status: PR - 12/26/2004
Well Name/No:FEDERAL #PA 342-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62161
Facility Status:PRStatus Date12/26/2004
FacilityID:272793LocationID:335286
County:GARFIELD #045Location:NENE 20 6S95W 6
Field:PARACHUTE - #67350Elevation:6428 ft.
Basin:PICEANCE BASIN  
Planned Location:1310FNL  822 FELLat/Long: 39.514018 / -108.016064Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.514034 / -108.015996Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/26/2004             Measured TD: 8965 ft.    Vertical TD: 8958 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/26/2004
Wellbore PermitDIRECTIONAL
Permit #:20041361 Expiration Date:6/28/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1492 FNL  644 FEL
Bottom Hole Location:Sec:SE Twp: NE Footage: 1492 FNL  644 FEL
Proposed Depth/Form:8986 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:11/5/2004
Spud Date:8/18/2004Spud Date Is:ACTUAL
Measured TD:8965 ft.Measured PB depth:8928 ft.
True Vertical TD:8958 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1492 FNL  644 FEL
Bottom Hole Location:Sec:SE Twp: NE Footage: 1492 FNL  644 FEL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1085 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 0 ft., Bottom: 1085 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8950 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 875, Top: 4190 ft., Bottom: 8950 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH3198 ft.NN
FORT UNION3570 ft.NN
MESAVERDE5426 ft.NN
CAMEO8092 ft.NN
ROLLINS8836 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/26/2004                Interval Top: 6904 ft.    Interval Bottom: 8831 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/5/2004
Treatment Summary:4000 GALS 7 1/2% HCL, 466706# 30/50, 13557 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8419 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/26/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1044
CASING_PRESS 1414
MCF_GAS 1044
TUBING_PRESS 1166
Perforation Data:
Interval Top:6904 ft.# Of Holes:90
Interval Bottom:8831 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)15
Total Gas Produced (MCF)6602
GOR440133
GOR DeterminationMCFE
Average BOE per Day3.167
Average MCFE per Day18.337

 Federal Financial Assurance  i Y

 Tribal Well  i No