|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: IJ - 8/1/2025 Measured TD: 9555 ft. Vertical TD: 9332 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW IJ - 8/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/16/2014 | | Proposed Top PZ Location: | Sec:11 Twp: 8S 93W | Footage: 1916 FSL 715 FEL | | Bottom Hole Location: | Sec:11 Twp: 8S 93W | Footage: 2022 FSL 689 FEL | | Proposed Depth/Form: | 9555 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | MIDDLETON CREEK | Unit Number: | COC68997 | | Formation And Spacing: | Code: CZ-CR , Formation: COZZETTE-CORCORAN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1492 ft., Weight: 32 , Citings Type: PLANNED | | Cement: | Sacks: 765, Top: 0 ft., Bottom: 1492 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9550 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1175, Top: 4050 ft., Bottom: 9555 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/1/2004 | | Spud Date: | 8/12/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 9555 ft. | Measured PB depth: | 5658 ft. | | True Vertical TD: | 9332 ft. | True Vertical PB depth: | 5435 ft. | | Top PZ Location: | Sec:11 Twp: 8S 93W | Footage: 1916 FSL 715 FEL | | Bottom Hole Location: | Sec:11 Twp: 8S 93W | Footage: 2022 FSL 689 FEL | | Log Types: | PEX, CBL - TEMP - GR | | Log Types: | CBL | | Log Types: | CBL | | Log Types: | | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 90, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1492 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 765, Top: 0 ft., Bottom: 1492 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9550 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1450, Top: 3200 ft., Bottom: 9555 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 3200 ft., Depth: 3300 ft., Bottom: 4050 ft., Sacks: 275, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: , Depth: 3300 ft., Bottom: , Sacks: 100, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: , Depth: 3300 ft., Bottom: , Sacks: 100, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 0 ft. | 6598 ft. | | | | WILLIAMS FORK | 6599 ft. | 9466 ft. | | | | ROLLINS | 9467 ft. | 9555 ft. | | |
Formation WMFK Formation Classification: OW Status: AB - 11/13/2013 Interval Top: 7782 ft. Interval Bottom: 9216 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/21/2012 | | Treatment Summary: | FORMATION WAS ABANDONED AS PART OF PROCEDURE TO PREP WELL FOR INJECTION INTO THE WASATCH | | Formation Treatment | | Treatment Date: | 3/11/2005 | | Treatment Summary: | SEE SCANNED DOC #01259927 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 286 | | BBLS_OIL | 2 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 286 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 368 | | CALC_MCF_GAS | 767 | | CASING_PRESS | 1176 | | MCF_GAS | 767 | | TUBING_PRESS | 482 |
| | Perforation Data: | | Interval Top: | 7782 ft. | # Of Holes: | 66 | | Interval Bottom: | 9216 ft. | Hole Size: | 0.38 in. |
|
Formation WSTC Formation Classification: OW Status: IJ - 8/1/2025 Interval Top: 3876 ft. Interval Bottom: 5532 ft.| Completed Information for Formation WASATCH | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WASATCH | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/7/2012 | Treatment End Date: | 6/7/2012 | | Treatment Summary: | STAGES 4 AND 5 WERE ACIDIZED WITH GELLED BRINE/ROCK SALT DIVERSION TO PREP INTERVAL FOR INJECTION | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 3814 ft. | | Tubing Packer Depth: | 3817 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WSTC. |
| | Perforation Data: | | Interval Top: | 3876 ft. | # Of Holes: | 980 | | Interval Bottom: | 5532 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | Y |
|
|