Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10144
Well Classification: GW Status: PR - 10/28/2005
Well Name/No:FEDERAL #PA 13-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/28/2005
FacilityID:272708LocationID:335446
County:GARFIELD #045Location:SWSW 28 6S95W 6
Field:PARACHUTE - #67350Elevation:5640 ft.
Basin:PICEANCE BASIN  
Planned Location:703FSL  318 FWLLat/Long: 39.490199 / -108.011464Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.490149 / -108.011413Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/28/2005             Measured TD: 7610 ft.    Vertical TD: 7516 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/28/2005
Wellbore PermitDIRECTIONAL
Permit #:20051142 Expiration Date:4/28/2006
Proposed Top PZ Location:Sec:28 Twp: 6S 95W Footage: 1433 FSL  886 FWL
Bottom Hole Location:Sec:28 Twp: 6S 95W Footage: 1433 FSL  886 FWL
Proposed Depth/Form:7766 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:9/22/2005
Spud Date:8/3/2005Spud Date Is:ACTUAL
Measured TD:7610 ft.Measured PB depth:7542 ft.
True Vertical TD:7516 ft.True Vertical PB depth:
Top PZ Location:Sec:28 Twp: 6S 95WFootage: 1433 FSL  886 FWL
Bottom Hole Location:Sec:28 Twp: 6S 95WFootage: 1433 FSL  886 FWL
Log Types:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2206 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 2205 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7598 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 885, Top: 3300 ft., Bottom: 7597 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND1974 ft.NN
FORT UNION2345 ft.NN
MESAVERDE4215 ft.NN
CAMEO6947 ft.NN
ROLLINS7576 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/28/2005                Interval Top: 5368 ft.    Interval Bottom: 7497 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/22/2005
Treatment Summary:4000 GALS 10% ACETIC ACID, 750,800# 30/50 SAND, 17,317 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7230 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/28/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1005
CASING_PRESS 1333
TUBING_PRESS 1170
Perforation Data:
Interval Top:5368 ft.# Of Holes:104
Interval Bottom:7497 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)13616
GOR800941
GOR DeterminationMCFE
Average BOE per Day6.480
Average MCFE per Day37.601

 Federal Financial Assurance  i Y

 Tribal Well  i No