Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10135
Well Classification: GW Status: PR - 10/10/2005
Well Name/No:FEDERAL #PA 443-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/10/2005
FacilityID:272688LocationID:335418
County:GARFIELD #045Location:NESE 27 6S95W 6
Field:PARACHUTE - #67350Elevation:5564 ft.
Basin:PICEANCE BASIN  
Planned Location:1351FSL  843 FELLat/Long: 39.492109 / -107.978383Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.492168 / -107.978433Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/10/2005             Measured TD: 8022 ft.    Vertical TD: 8002 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/10/2005
Wellbore PermitDIRECTIONAL
Permit #:20051123 Expiration Date:4/26/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1604 FSL  578 FEL
Bottom Hole Location:Sec: Twp: Footage: 1604 FSL  578 FEL
Proposed Depth/Form:8118 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:8/23/2005
Spud Date:8/12/2005Spud Date Is:ACTUAL
Measured TD:8022 ft.Measured PB depth:7948 ft.
True Vertical TD:8002 ft.True Vertical PB depth:
Top PZ Location:Sec:27 Twp: 6S 95WFootage: 1624 FSL  566 FEL
Bottom Hole Location:Sec:27 Twp: 6S 95WFootage: 1624 FSL  566 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUD; CHI PROCESSED TRIPLE COMBO
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2392 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 632, Top: 0 ft., Bottom: 2392 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8009 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 885, Top: 4100 ft., Bottom: 8009 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2168 ft.NN
FORT UNION2443 ft.NN
MESAVERDE4473 ft.NN
CAMEO7279 ft.NN
ROLLINS7960 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/10/2005                Interval Top: 5880 ft.    Interval Bottom: 7472 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/9/2005Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/2/2005
Treatment Summary:9/2/05 1750 GALS 10% ACETIC ACID; 1500 GALS 7 1/2% HCL; 625100# 30/50 SAND; 14688 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7253 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/10/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1480
CASING_PRESS 1935
MCF_GAS 14810
TUBING_PRESS 1825
Perforation Data:
Interval Top:5880 ft.# Of Holes:97
Interval Bottom:7472 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)25
Total Gas Produced (MCF)11869
GOR474760
GOR DeterminationMCFE
Average BOE per Day5.681
Average MCFE per Day32.959

 Federal Financial Assurance  i Y

 Tribal Well  i No