Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10133
Well Classification: OW Status: PR - 12/26/2004
Well Name/No:FEDERAL #GM 534-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C-24603
Facility Status:PRStatus Date12/26/2004
FacilityID:272686LocationID:334846
County:GARFIELD #045Location:SWSE 3 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5741 ft.
Basin:PICEANCE BASIN  
Planned Location:239FSL  1709 FELLat/Long: 39.459429 / -108.093016Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.459467 / -108.093109Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/26/2004             Measured TD: 6665 ft.    Vertical TD: 6572 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/26/2004
Wellbore PermitDIRECTIONAL
Permit #:20041268 Expiration Date:6/21/2005
Proposed Top PZ Location:Sec: Twp: Footage: 961 FSL  2348 FEL
Bottom Hole Location:Sec: Twp: Footage: 961 FSL  2348 FEL
Proposed Depth/Form:6692 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:11/20/2004
Spud Date:9/30/2004Spud Date Is:ACTUAL
Measured TD:6665 ft.Measured PB depth:6560 ft.
True Vertical TD:6572 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 961 FSL  2348 FEL
Bottom Hole Location:Sec: Twp: Footage: 961 FSL  2348 FEL
Log Types:HIGH RESOLUTION IND.-SPECTRAL DEN.-DUAL SPACED NEU,CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1130 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1130 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6665 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 825, Top: 2600 ft., Bottom: 6665 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1852 ft.NN
FORT UNION2162 ft.NN
MESAVERDE3557 ft.NN
CAMEO6038 ft.NN
ROLLINS6518 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 12/26/2004                Interval Top: 4743 ft.    Interval Bottom: 6478 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/20/2004
Treatment Summary:4750 GALS 7-1/2% HCL, 680617# 30/50 SAND, 16251 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:6145 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/26/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_MCF_GAS 1213
CASING_PRESS 1028
MCF_GAS 1213
TUBING_PRESS 837
Perforation Data:
Interval Top:4743 ft.# Of Holes:103
Interval Bottom:6478 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)10
Total Gas Produced (MCF)5674
GOR567400
GOR DeterminationMCFE
Average BOE per Day2.707
Average MCFE per Day15.710

 Federal Financial Assurance  i Y

 Tribal Well  i No